You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@spark.apache.org by "Reynold Xin (JIRA)" <ji...@apache.org> on 2015/06/09 08:16:00 UTC

[jira] [Created] (SPARK-8198) months_between function

Reynold Xin created SPARK-8198:
----------------------------------

             Summary: months_between function
                 Key: SPARK-8198
                 URL: https://issues.apache.org/jira/browse/SPARK-8198
             Project: Spark
          Issue Type: Sub-task
            Reporter: Reynold Xin


months_between(date1, date2): double

Returns number of months between dates date1 and date2 (as of Hive 1.2.0). If date1 is later than date2, then the result is positive. If date1 is earlier than date2, then the result is negative. If date1 and date2 are either the same days of the month or both last days of months, then the result is always an integer. Otherwise the UDF calculates the fractional portion of the result based on a 31-day month and considers the difference in time components date1 and date2. date1 and date2 type can be date, timestamp or string in the format 'yyyy-MM-dd' or 'yyyy-MM-dd HH:mm:ss'. The result is rounded to 8 decimal places. Example: months_between('1997-02-28 10:30:00', '1996-10-30') = 3.94959677




--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@spark.apache.org
For additional commands, e-mail: issues-help@spark.apache.org