You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@beam.apache.org by "Pablo Estrada (Jira)" <ji...@apache.org> on 2019/11/19 19:09:00 UTC

[jira] [Updated] (BEAM-8745) More fine-grained controls for the size of a BigQuery Load job

     [ https://issues.apache.org/jira/browse/BEAM-8745?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pablo Estrada updated BEAM-8745:
--------------------------------
    Status: Open  (was: Triage Needed)

> More fine-grained controls for the size of a BigQuery Load job
> --------------------------------------------------------------
>
>                 Key: BEAM-8745
>                 URL: https://issues.apache.org/jira/browse/BEAM-8745
>             Project: Beam
>          Issue Type: Improvement
>          Components: io-java-gcp
>            Reporter: Pablo Estrada
>            Assignee: Pablo Estrada
>            Priority: Major
>
> Users have hit problems where load jobs into very wide tables (100s of columns) are very slow, and sometimes fail. Feedback from BigQuery is that for very wide tables, smaller load jobs can avoid failures, and slowdowns.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)