You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Andrei Dulceanu (JIRA)" <ji...@apache.org> on 2017/01/03 09:23:58 UTC
[jira] [Assigned] (OAK-5360) Cancellation of gc should be reflected
by RevisionGC.getRevisionGCStatus()
[ https://issues.apache.org/jira/browse/OAK-5360?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrei Dulceanu reassigned OAK-5360:
------------------------------------
Assignee: Andrei Dulceanu (was: Michael Dürig)
> Cancellation of gc should be reflected by RevisionGC.getRevisionGCStatus()
> --------------------------------------------------------------------------
>
> Key: OAK-5360
> URL: https://issues.apache.org/jira/browse/OAK-5360
> Project: Jackrabbit Oak
> Issue Type: Improvement
> Components: core, segment-tar
> Reporter: Michael Dürig
> Assignee: Andrei Dulceanu
> Labels: gc, management, monitoring, production
> Fix For: 1.5.17, 1.6
>
>
> Currently when a garbage collection cycle is cancelled from "within" (i.e. through {{CancelCompactionSupplier}} then this is not reflected through {{RevisionGC.getRevisionGCStatus()}} but rather reported as successful run. We should change this and return a failure result indication the cancellation so downstream consumers get an proper indication whether and which gc runs actually succeeded.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)