You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "mahesh kumar behera (JIRA)" <ji...@apache.org> on 2018/06/08 11:16:00 UTC

[jira] [Assigned] (HIVE-19829) Incremental replication load should create tasks in execution phase rather than semantic phase

     [ https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

mahesh kumar behera reassigned HIVE-19829:
------------------------------------------


> Incremental replication load should create tasks in execution phase rather than semantic phase
> ----------------------------------------------------------------------------------------------
>
>                 Key: HIVE-19829
>                 URL: https://issues.apache.org/jira/browse/HIVE-19829
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>             Fix For: 3.1.0, 4.0.0
>
>
> Split the incremental load into multiple iterations. In each iteration create number of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)