You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Rui Fan (Jira)" <ji...@apache.org> on 2026/03/03 09:50:00 UTC
[jira] [Updated] (FLINK-39140) [FLINK-39140][checkpoint] Allow multiple rescales in Unaligned Checkpoint ITCases to perform checkpointing during recovery
[ https://issues.apache.org/jira/browse/FLINK-39140?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Rui Fan updated FLINK-39140:
----------------------------
Summary: [FLINK-39140][checkpoint] Allow multiple rescales in Unaligned Checkpoint ITCases to perform checkpointing during recovery (was: Enhance Unaligned Checkpoint ITCases to perform checkpointing during recovery)
> [FLINK-39140][checkpoint] Allow multiple rescales in Unaligned Checkpoint ITCases to perform checkpointing during recovery
> --------------------------------------------------------------------------------------------------------------------------
>
> Key: FLINK-39140
> URL: https://issues.apache.org/jira/browse/FLINK-39140
> Project: Flink
> Issue Type: Sub-task
> Reporter: Rui Fan
> Assignee: Rui Fan
> Priority: Major
>
> Current Unaligned Checkpoint ITCases only restart once from a normal checkpoint. They do not cover restoring from a checkpoint produced by recovery phase — which is the key scenario for checkpointing during recovery.
> *Proposed mechanism:* After restoring from a checkpoint, wait for the first new checkpoint to be produced, then immediately trigger a restart from it. Repeat for a configurable number of rounds (≥ 2). Whether to rescale depends on the specific test case.
> This mechanism works on the current master (validating normal checkpoint recovery). Once checkpointing during recovery is enabled, the same tests automatically cover recovery-phase checkpoint scenarios.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)