You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Yun Zhao (JIRA)" <ji...@apache.org> on 2017/11/09 14:37:00 UTC
[jira] [Created] (HBASE-19226) Limit the reduce tasks number of
incremental load
Yun Zhao created HBASE-19226:
--------------------------------
Summary: Limit the reduce tasks number of incremental load
Key: HBASE-19226
URL: https://issues.apache.org/jira/browse/HBASE-19226
Project: HBase
Issue Type: Improvement
Reporter: Yun Zhao
Priority: Minor
When using MapReduce job to perform an incremental load into a table,the number of reduce tasks is the current number of regions. If there are too many regions, will lead to network+disk I/O is too large, affecting the real-time request.
Need to use a configuration to set a number or ratio?
Limit running reduce tasks since [https://issues.apache.org/jira/browse/MAPREDUCE-5583], the old version can only be set reduce number.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)