You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@flink.apache.org by "Matthias Pohl (Jira)" <ji...@apache.org> on 2023/12/01 07:40:00 UTC

[jira] [Created] (FLINK-33720) Building Flink took suspiciously long in e2e1 stage with Hadoop 3.1.3 enabled

Matthias Pohl created FLINK-33720:
-------------------------------------

             Summary: Building Flink took suspiciously long in e2e1 stage with Hadoop 3.1.3 enabled
                 Key: FLINK-33720
                 URL: https://issues.apache.org/jira/browse/FLINK-33720
             Project: Flink
          Issue Type: Bug
          Components: Build System / CI
    Affects Versions: 1.17.2
            Reporter: Matthias Pohl


[https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=55085&view=logs&j=bbb1e2a2-a43c-55c8-fb48-5cfe7a8a0ca6&t=ba24ad14-6ea3-5ee3-c4ec-9e7cd2c9e754]

the stage for building Flink hit the time limit of 6 hours and was cancelled. There are no logs provided. But I suspect it to be an infrastructure problem (and, therefore, not falling into the class of issues we can resolve). I created this issue for documentation purposes, anyway.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)