Hey folks,
It's getting close to the proposed Sept 30 release date -- can
folks enumerate the blocking issues in JIRA (they're all already in JIRA,
right?), so all contributors have a clear idea ways in which they can help
out getting to a complete, stable, 0.8.1-compliant release?

Thanks,
-Dan

On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com> wrote:

> Hi everyone,
>
> We've been saying for a while that 0.8 completion was a prerequisite for
> our
> first release. As we approach this milestone, it's time to really get
> serious about it.
>
> To make this happen, we're going to need to do the following:
>
> 1. Lock down all public interfaces and signatures. This is critical if we
> want to be able to offer any compatibility guarantees.
>
> 2. Get rid of rough edges. Now is the time to resolve any outstanding
> integration issues.
>
> 3. Lock down a target release date. September 30th gets my vote, but I'm
> willing to hear arguments otherwise.
>
> We can lock down the release into distinct components, as long as
> compatibility guarantees are met, but we should strive to release
> everything
> at around the same time so as to avoid developer confusion.
>
> There are 5 major components that need to be released:
>
> - javascript (all together, due to interdependencies)
> - Java/PHP social data component
> - Java/PHP gadget rendering component
>
> I'm not that concerned about the java web app artifact, but that wouldn't
> hurt either.
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Cassie <do...@apache.org>.
All the java social issues are in jira and marked as blockers. As of right
now it looks like there are 7 blockers (I just went through the list today
to clean things up):  621, 601, 562, 561, 560, 559, 497
Does anybody know of any java social issues that are not filed?
Or think that the blocking/non-blocking status needs to be modified?

- Cassie



On Tue, Sep 23, 2008 at 5:45 PM, Dan Peterson <dp...@google.com> wrote:

> Hey folks,
> It's getting close to the proposed Sept 30 release date -- can
> folks enumerate the blocking issues in JIRA (they're all already in JIRA,
> right?), so all contributors have a clear idea ways in which they can help
> out getting to a complete, stable, 0.8.1-compliant release?
>
> Thanks,
> -Dan
>
> On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com> wrote:
>
> > Hi everyone,
> >
> > We've been saying for a while that 0.8 completion was a prerequisite for
> > our
> > first release. As we approach this milestone, it's time to really get
> > serious about it.
> >
> > To make this happen, we're going to need to do the following:
> >
> > 1. Lock down all public interfaces and signatures. This is critical if we
> > want to be able to offer any compatibility guarantees.
> >
> > 2. Get rid of rough edges. Now is the time to resolve any outstanding
> > integration issues.
> >
> > 3. Lock down a target release date. September 30th gets my vote, but I'm
> > willing to hear arguments otherwise.
> >
> > We can lock down the release into distinct components, as long as
> > compatibility guarantees are met, but we should strive to release
> > everything
> > at around the same time so as to avoid developer confusion.
> >
> > There are 5 major components that need to be released:
> >
> > - javascript (all together, due to interdependencies)
> > - Java/PHP social data component
> > - Java/PHP gadget rendering component
> >
> > I'm not that concerned about the java web app artifact, but that wouldn't
> > hurt either.
> >
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Ian Boston <ie...@tfd.co.uk>.
I am having a look at the xml serialization and the betwixt issues  
(SHINDIG-562), but haven't assigned that blocker to myself yet as I  
am not certain I will come up with a fix. As Cassie said, betwixt can  
do your head in.
Ian
On 7 Oct 2008, at 01:31, Chris Chabot wrote:

> As far as i know the blocker issues are indeed correct (i'll have  
> to verify
> though, i'll save that for tomorrow morning), most of them are  
> relatively
> small though, and better yet, a few of them have patches available  
> too!
>
> Joseph Smarr's indicated he's still intending to work on the OAuth  
> support,
> but has been doing a bit of a tour around the US (sadly without the  
> rockstar
> style limo's and stuff though i think); But i have hope that will  
> find it's
> way to completion soon (possibly with the help from gonzalo and  
> ropu, they
> both offered)
>
> json-rpc and all that comes with it is very, very close to completion,
> together with it's complete clean up of the social interface,  
> there's the
> last 4 or so failing tests in the test suite i would *really* like  
> to have
> fixed before committing so i can be sure it's ready for consumption  
> (ripping
> out working code and replacing it with something new is always  
> scary, so it
> better be a whole lot better!), I had hoped to finish that last  
> week but
> there were some other engagements that kept me otherwise occupied  
> too, but
> this week looks completely open, so that'll be dedicated to the  
> final push
> to finish the social api.
>
> After that it's the other blocker issues that remain, and a few eye  
> balls
> wouldn't hurt either, but all in all I'd say we're *almost* ready  
> on the php
> side of things, I'm hoping to have it all completed and hopefully  
> reviewed
> by everyone within 2 weeks, and ready for release
>
> On Tue, Oct 7, 2008 at 2:03 AM, Kevin Brown <et...@google.com> wrote:
>
>> On Mon, Oct 6, 2008 at 4:39 PM, Dan Peterson  
>> <dp...@google.com> wrote:
>>
>>> Thanks, Kevin.
>>> So what does that mean for the 8 "blocker" issues? It sounds like  
>>> some of
>>> those are either not blockers or are resolved but out of date?
>>>
>>
>> They're probably mis categorized.
>>
>>
>>>
>>> Chris, would love an update about Shindig PHP if you get a chance :)
>>>
>>> -Dan
>>>
>>>
>>> On Mon, Oct 6, 2008 at 4:31 PM, Kevin Brown <et...@google.com> wrote:
>>>
>>>> At this point in time I don't anticipate any major changes in  
>>>> the java
>>>> code base. Chris is still working on several PHP items, and I  
>>>> don't want
>> to
>>>> do a release without both implementations being in agreement  
>>>> because we
>>>> don't yet know whether the needs of PHP will require changes to the
>> client
>>>> code.
>>>>
>>>>
>>>> On Mon, Oct 6, 2008 at 2:41 PM, Dan Peterson <dpeterson@google.com
>>> wrote:
>>>>
>>>>> Thanks for the updates.
>>>>> How are things going?
>>>>>
>>>>> I see there are currently 8 "blocker" issues -- is that the set of
>> issues
>>>>> gating a formal release? If not, can the other issues be added  
>>>>> so we
>> have
>>>>> a
>>>>> clear set of tasks?
>>>>>
>>>>> -Dan
>>>>>
>>>>> On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com>
>>>>> wrote:
>>>>>
>>>>>> On the PHP side of things we have 2 large items still open:
>>>>>> - JSON-RPC
>>>>>> - OAuth support for the REST service
>>>>>>
>>>>>> The good news is that these are actively being worked on (Joseph
>> Smarr
>>>>>> doing
>>>>>> the OAuth bit, and me on JSON-RPC), but the bad news is that with
>>>>> Joseph
>>>>>> having various engagements in the US, and me doing the Google
>> Developer
>>>>>> Days
>>>>>> tour in euope, we really can't commit to having that completed in
>> time
>>>>> for
>>>>>> a
>>>>>> 30th release date. Also keep in mind that since they are  
>>>>>> important
>> and
>>>>>> somewhat sizable components they might need some testing after  
>>>>>> being
>>>>>> committed too, so realisticely I think the earliest time I  
>>>>>> would be
>>>>> able to
>>>>>> call it release ready is somewhere around oct 13-17.
>>>>>>
>>>>>> There are a few smaller issues in JIRA too, which some great  
>>>>>> guys are
>>>>>> working on or even have submitted patches for already, so I  
>>>>>> think it
>>>>> looks
>>>>>> like we'll have those bits covered.
>>>>>>
>>>>>>  -- Chris
>>>>>>
>>>>>> On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com>
>> wrote:
>>>>>>
>>>>>>> It's not going to happen by the 30th. Issues are open in  
>>>>>>> JIRA, but
>>>>>> there's
>>>>>>> just far too much work for it to happen in 6 days time.
>>>>>>>
>>>>>>> On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <
>> dpeterson@google.com>
>>>>>>> wrote:
>>>>>>>
>>>>>>>> Hey folks,
>>>>>>>> It's getting close to the proposed Sept 30 release date -- can
>>>>>>>> folks enumerate the blocking issues in JIRA (they're all  
>>>>>>>> already
>> in
>>>>>> JIRA,
>>>>>>>> right?), so all contributors have a clear idea ways in which  
>>>>>>>> they
>>>>> can
>>>>>>> help
>>>>>>>> out getting to a complete, stable, 0.8.1-compliant release?
>>>>>>>>
>>>>>>>> Thanks,
>>>>>>>> -Dan
>>>>>>>>
>>>>>>>> On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com>
>>>>> wrote:
>>>>>>>>
>>>>>>>>> Hi everyone,
>>>>>>>>>
>>>>>>>>> We've been saying for a while that 0.8 completion was a
>>>>> prerequisite
>>>>>>> for
>>>>>>>>> our
>>>>>>>>> first release. As we approach this milestone, it's time to
>> really
>>>>> get
>>>>>>>>> serious about it.
>>>>>>>>>
>>>>>>>>> To make this happen, we're going to need to do the following:
>>>>>>>>>
>>>>>>>>> 1. Lock down all public interfaces and signatures. This is
>>>>> critical
>>>>>> if
>>>>>>> we
>>>>>>>>> want to be able to offer any compatibility guarantees.
>>>>>>>>>
>>>>>>>>> 2. Get rid of rough edges. Now is the time to resolve any
>>>>> outstanding
>>>>>>>>> integration issues.
>>>>>>>>>
>>>>>>>>> 3. Lock down a target release date. September 30th gets my
>> vote,
>>>>> but
>>>>>>> I'm
>>>>>>>>> willing to hear arguments otherwise.
>>>>>>>>>
>>>>>>>>> We can lock down the release into distinct components, as long
>> as
>>>>>>>>> compatibility guarantees are met, but we should strive to
>> release
>>>>>>>>> everything
>>>>>>>>> at around the same time so as to avoid developer confusion.
>>>>>>>>>
>>>>>>>>> There are 5 major components that need to be released:
>>>>>>>>>
>>>>>>>>> - javascript (all together, due to interdependencies)
>>>>>>>>> - Java/PHP social data component
>>>>>>>>> - Java/PHP gadget rendering component
>>>>>>>>>
>>>>>>>>> I'm not that concerned about the java web app artifact, but
>> that
>>>>>>> wouldn't
>>>>>>>>> hurt either.
>>>>>>>>>
>>>>>>>>
>>>>>>>
>>>>>>
>>>>>
>>>>
>>>>
>>>
>>


Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Chris Chabot <ch...@google.com>.
As far as i know the blocker issues are indeed correct (i'll have to verify
though, i'll save that for tomorrow morning), most of them are relatively
small though, and better yet, a few of them have patches available too!

Joseph Smarr's indicated he's still intending to work on the OAuth support,
but has been doing a bit of a tour around the US (sadly without the rockstar
style limo's and stuff though i think); But i have hope that will find it's
way to completion soon (possibly with the help from gonzalo and ropu, they
both offered)

json-rpc and all that comes with it is very, very close to completion,
together with it's complete clean up of the social interface, there's the
last 4 or so failing tests in the test suite i would *really* like to have
fixed before committing so i can be sure it's ready for consumption (ripping
out working code and replacing it with something new is always scary, so it
better be a whole lot better!), I had hoped to finish that last week but
there were some other engagements that kept me otherwise occupied too, but
this week looks completely open, so that'll be dedicated to the final push
to finish the social api.

After that it's the other blocker issues that remain, and a few eye balls
wouldn't hurt either, but all in all I'd say we're *almost* ready on the php
side of things, I'm hoping to have it all completed and hopefully reviewed
by everyone within 2 weeks, and ready for release

On Tue, Oct 7, 2008 at 2:03 AM, Kevin Brown <et...@google.com> wrote:

> On Mon, Oct 6, 2008 at 4:39 PM, Dan Peterson <dp...@google.com> wrote:
>
> > Thanks, Kevin.
> > So what does that mean for the 8 "blocker" issues? It sounds like some of
> > those are either not blockers or are resolved but out of date?
> >
>
> They're probably mis categorized.
>
>
> >
> > Chris, would love an update about Shindig PHP if you get a chance :)
> >
> > -Dan
> >
> >
> > On Mon, Oct 6, 2008 at 4:31 PM, Kevin Brown <et...@google.com> wrote:
> >
> >> At this point in time I don't anticipate any major changes in the java
> >> code base. Chris is still working on several PHP items, and I don't want
> to
> >> do a release without both implementations being in agreement because we
> >> don't yet know whether the needs of PHP will require changes to the
> client
> >> code.
> >>
> >>
> >> On Mon, Oct 6, 2008 at 2:41 PM, Dan Peterson <dpeterson@google.com
> >wrote:
> >>
> >>> Thanks for the updates.
> >>> How are things going?
> >>>
> >>> I see there are currently 8 "blocker" issues -- is that the set of
> issues
> >>> gating a formal release? If not, can the other issues be added so we
> have
> >>> a
> >>> clear set of tasks?
> >>>
> >>> -Dan
> >>>
> >>> On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com>
> >>> wrote:
> >>>
> >>> > On the PHP side of things we have 2 large items still open:
> >>> > - JSON-RPC
> >>> > - OAuth support for the REST service
> >>> >
> >>> > The good news is that these are actively being worked on (Joseph
> Smarr
> >>> > doing
> >>> > the OAuth bit, and me on JSON-RPC), but the bad news is that with
> >>> Joseph
> >>> > having various engagements in the US, and me doing the Google
> Developer
> >>> > Days
> >>> > tour in euope, we really can't commit to having that completed in
> time
> >>> for
> >>> > a
> >>> > 30th release date. Also keep in mind that since they are important
> and
> >>> > somewhat sizable components they might need some testing after being
> >>> > committed too, so realisticely I think the earliest time I would be
> >>> able to
> >>> > call it release ready is somewhere around oct 13-17.
> >>> >
> >>> > There are a few smaller issues in JIRA too, which some great guys are
> >>> > working on or even have submitted patches for already, so I think it
> >>> looks
> >>> > like we'll have those bits covered.
> >>> >
> >>> >  -- Chris
> >>> >
> >>> > On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com>
> wrote:
> >>> >
> >>> > > It's not going to happen by the 30th. Issues are open in JIRA, but
> >>> > there's
> >>> > > just far too much work for it to happen in 6 days time.
> >>> > >
> >>> > > On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <
> dpeterson@google.com>
> >>> > > wrote:
> >>> > >
> >>> > > > Hey folks,
> >>> > > > It's getting close to the proposed Sept 30 release date -- can
> >>> > > > folks enumerate the blocking issues in JIRA (they're all already
> in
> >>> > JIRA,
> >>> > > > right?), so all contributors have a clear idea ways in which they
> >>> can
> >>> > > help
> >>> > > > out getting to a complete, stable, 0.8.1-compliant release?
> >>> > > >
> >>> > > > Thanks,
> >>> > > > -Dan
> >>> > > >
> >>> > > > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com>
> >>> wrote:
> >>> > > >
> >>> > > > > Hi everyone,
> >>> > > > >
> >>> > > > > We've been saying for a while that 0.8 completion was a
> >>> prerequisite
> >>> > > for
> >>> > > > > our
> >>> > > > > first release. As we approach this milestone, it's time to
> really
> >>> get
> >>> > > > > serious about it.
> >>> > > > >
> >>> > > > > To make this happen, we're going to need to do the following:
> >>> > > > >
> >>> > > > > 1. Lock down all public interfaces and signatures. This is
> >>> critical
> >>> > if
> >>> > > we
> >>> > > > > want to be able to offer any compatibility guarantees.
> >>> > > > >
> >>> > > > > 2. Get rid of rough edges. Now is the time to resolve any
> >>> outstanding
> >>> > > > > integration issues.
> >>> > > > >
> >>> > > > > 3. Lock down a target release date. September 30th gets my
> vote,
> >>> but
> >>> > > I'm
> >>> > > > > willing to hear arguments otherwise.
> >>> > > > >
> >>> > > > > We can lock down the release into distinct components, as long
> as
> >>> > > > > compatibility guarantees are met, but we should strive to
> release
> >>> > > > > everything
> >>> > > > > at around the same time so as to avoid developer confusion.
> >>> > > > >
> >>> > > > > There are 5 major components that need to be released:
> >>> > > > >
> >>> > > > > - javascript (all together, due to interdependencies)
> >>> > > > > - Java/PHP social data component
> >>> > > > > - Java/PHP gadget rendering component
> >>> > > > >
> >>> > > > > I'm not that concerned about the java web app artifact, but
> that
> >>> > > wouldn't
> >>> > > > > hurt either.
> >>> > > > >
> >>> > > >
> >>> > >
> >>> >
> >>>
> >>
> >>
> >
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Kevin Brown <et...@google.com>.
On Mon, Oct 6, 2008 at 4:39 PM, Dan Peterson <dp...@google.com> wrote:

> Thanks, Kevin.
> So what does that mean for the 8 "blocker" issues? It sounds like some of
> those are either not blockers or are resolved but out of date?
>

They're probably mis categorized.


>
> Chris, would love an update about Shindig PHP if you get a chance :)
>
> -Dan
>
>
> On Mon, Oct 6, 2008 at 4:31 PM, Kevin Brown <et...@google.com> wrote:
>
>> At this point in time I don't anticipate any major changes in the java
>> code base. Chris is still working on several PHP items, and I don't want to
>> do a release without both implementations being in agreement because we
>> don't yet know whether the needs of PHP will require changes to the client
>> code.
>>
>>
>> On Mon, Oct 6, 2008 at 2:41 PM, Dan Peterson <dp...@google.com>wrote:
>>
>>> Thanks for the updates.
>>> How are things going?
>>>
>>> I see there are currently 8 "blocker" issues -- is that the set of issues
>>> gating a formal release? If not, can the other issues be added so we have
>>> a
>>> clear set of tasks?
>>>
>>> -Dan
>>>
>>> On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com>
>>> wrote:
>>>
>>> > On the PHP side of things we have 2 large items still open:
>>> > - JSON-RPC
>>> > - OAuth support for the REST service
>>> >
>>> > The good news is that these are actively being worked on (Joseph Smarr
>>> > doing
>>> > the OAuth bit, and me on JSON-RPC), but the bad news is that with
>>> Joseph
>>> > having various engagements in the US, and me doing the Google Developer
>>> > Days
>>> > tour in euope, we really can't commit to having that completed in time
>>> for
>>> > a
>>> > 30th release date. Also keep in mind that since they are important and
>>> > somewhat sizable components they might need some testing after being
>>> > committed too, so realisticely I think the earliest time I would be
>>> able to
>>> > call it release ready is somewhere around oct 13-17.
>>> >
>>> > There are a few smaller issues in JIRA too, which some great guys are
>>> > working on or even have submitted patches for already, so I think it
>>> looks
>>> > like we'll have those bits covered.
>>> >
>>> >  -- Chris
>>> >
>>> > On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com> wrote:
>>> >
>>> > > It's not going to happen by the 30th. Issues are open in JIRA, but
>>> > there's
>>> > > just far too much work for it to happen in 6 days time.
>>> > >
>>> > > On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com>
>>> > > wrote:
>>> > >
>>> > > > Hey folks,
>>> > > > It's getting close to the proposed Sept 30 release date -- can
>>> > > > folks enumerate the blocking issues in JIRA (they're all already in
>>> > JIRA,
>>> > > > right?), so all contributors have a clear idea ways in which they
>>> can
>>> > > help
>>> > > > out getting to a complete, stable, 0.8.1-compliant release?
>>> > > >
>>> > > > Thanks,
>>> > > > -Dan
>>> > > >
>>> > > > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com>
>>> wrote:
>>> > > >
>>> > > > > Hi everyone,
>>> > > > >
>>> > > > > We've been saying for a while that 0.8 completion was a
>>> prerequisite
>>> > > for
>>> > > > > our
>>> > > > > first release. As we approach this milestone, it's time to really
>>> get
>>> > > > > serious about it.
>>> > > > >
>>> > > > > To make this happen, we're going to need to do the following:
>>> > > > >
>>> > > > > 1. Lock down all public interfaces and signatures. This is
>>> critical
>>> > if
>>> > > we
>>> > > > > want to be able to offer any compatibility guarantees.
>>> > > > >
>>> > > > > 2. Get rid of rough edges. Now is the time to resolve any
>>> outstanding
>>> > > > > integration issues.
>>> > > > >
>>> > > > > 3. Lock down a target release date. September 30th gets my vote,
>>> but
>>> > > I'm
>>> > > > > willing to hear arguments otherwise.
>>> > > > >
>>> > > > > We can lock down the release into distinct components, as long as
>>> > > > > compatibility guarantees are met, but we should strive to release
>>> > > > > everything
>>> > > > > at around the same time so as to avoid developer confusion.
>>> > > > >
>>> > > > > There are 5 major components that need to be released:
>>> > > > >
>>> > > > > - javascript (all together, due to interdependencies)
>>> > > > > - Java/PHP social data component
>>> > > > > - Java/PHP gadget rendering component
>>> > > > >
>>> > > > > I'm not that concerned about the java web app artifact, but that
>>> > > wouldn't
>>> > > > > hurt either.
>>> > > > >
>>> > > >
>>> > >
>>> >
>>>
>>
>>
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Dan Peterson <dp...@google.com>.
Thanks, Kevin.
So what does that mean for the 8 "blocker" issues? It sounds like some of
those are either not blockers or are resolved but out of date?

Chris, would love an update about Shindig PHP if you get a chance :)

-Dan

On Mon, Oct 6, 2008 at 4:31 PM, Kevin Brown <et...@google.com> wrote:

> At this point in time I don't anticipate any major changes in the java code
> base. Chris is still working on several PHP items, and I don't want to do a
> release without both implementations being in agreement because we don't yet
> know whether the needs of PHP will require changes to the client code.
>
>
> On Mon, Oct 6, 2008 at 2:41 PM, Dan Peterson <dp...@google.com> wrote:
>
>> Thanks for the updates.
>> How are things going?
>>
>> I see there are currently 8 "blocker" issues -- is that the set of issues
>> gating a formal release? If not, can the other issues be added so we have
>> a
>> clear set of tasks?
>>
>> -Dan
>>
>> On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com> wrote:
>>
>> > On the PHP side of things we have 2 large items still open:
>> > - JSON-RPC
>> > - OAuth support for the REST service
>> >
>> > The good news is that these are actively being worked on (Joseph Smarr
>> > doing
>> > the OAuth bit, and me on JSON-RPC), but the bad news is that with Joseph
>> > having various engagements in the US, and me doing the Google Developer
>> > Days
>> > tour in euope, we really can't commit to having that completed in time
>> for
>> > a
>> > 30th release date. Also keep in mind that since they are important and
>> > somewhat sizable components they might need some testing after being
>> > committed too, so realisticely I think the earliest time I would be able
>> to
>> > call it release ready is somewhere around oct 13-17.
>> >
>> > There are a few smaller issues in JIRA too, which some great guys are
>> > working on or even have submitted patches for already, so I think it
>> looks
>> > like we'll have those bits covered.
>> >
>> >  -- Chris
>> >
>> > On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com> wrote:
>> >
>> > > It's not going to happen by the 30th. Issues are open in JIRA, but
>> > there's
>> > > just far too much work for it to happen in 6 days time.
>> > >
>> > > On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com>
>> > > wrote:
>> > >
>> > > > Hey folks,
>> > > > It's getting close to the proposed Sept 30 release date -- can
>> > > > folks enumerate the blocking issues in JIRA (they're all already in
>> > JIRA,
>> > > > right?), so all contributors have a clear idea ways in which they
>> can
>> > > help
>> > > > out getting to a complete, stable, 0.8.1-compliant release?
>> > > >
>> > > > Thanks,
>> > > > -Dan
>> > > >
>> > > > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com>
>> wrote:
>> > > >
>> > > > > Hi everyone,
>> > > > >
>> > > > > We've been saying for a while that 0.8 completion was a
>> prerequisite
>> > > for
>> > > > > our
>> > > > > first release. As we approach this milestone, it's time to really
>> get
>> > > > > serious about it.
>> > > > >
>> > > > > To make this happen, we're going to need to do the following:
>> > > > >
>> > > > > 1. Lock down all public interfaces and signatures. This is
>> critical
>> > if
>> > > we
>> > > > > want to be able to offer any compatibility guarantees.
>> > > > >
>> > > > > 2. Get rid of rough edges. Now is the time to resolve any
>> outstanding
>> > > > > integration issues.
>> > > > >
>> > > > > 3. Lock down a target release date. September 30th gets my vote,
>> but
>> > > I'm
>> > > > > willing to hear arguments otherwise.
>> > > > >
>> > > > > We can lock down the release into distinct components, as long as
>> > > > > compatibility guarantees are met, but we should strive to release
>> > > > > everything
>> > > > > at around the same time so as to avoid developer confusion.
>> > > > >
>> > > > > There are 5 major components that need to be released:
>> > > > >
>> > > > > - javascript (all together, due to interdependencies)
>> > > > > - Java/PHP social data component
>> > > > > - Java/PHP gadget rendering component
>> > > > >
>> > > > > I'm not that concerned about the java web app artifact, but that
>> > > wouldn't
>> > > > > hurt either.
>> > > > >
>> > > >
>> > >
>> >
>>
>
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Kevin Brown <et...@google.com>.
At this point in time I don't anticipate any major changes in the java code
base. Chris is still working on several PHP items, and I don't want to do a
release without both implementations being in agreement because we don't yet
know whether the needs of PHP will require changes to the client code.

On Mon, Oct 6, 2008 at 2:41 PM, Dan Peterson <dp...@google.com> wrote:

> Thanks for the updates.
> How are things going?
>
> I see there are currently 8 "blocker" issues -- is that the set of issues
> gating a formal release? If not, can the other issues be added so we have a
> clear set of tasks?
>
> -Dan
>
> On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com> wrote:
>
> > On the PHP side of things we have 2 large items still open:
> > - JSON-RPC
> > - OAuth support for the REST service
> >
> > The good news is that these are actively being worked on (Joseph Smarr
> > doing
> > the OAuth bit, and me on JSON-RPC), but the bad news is that with Joseph
> > having various engagements in the US, and me doing the Google Developer
> > Days
> > tour in euope, we really can't commit to having that completed in time
> for
> > a
> > 30th release date. Also keep in mind that since they are important and
> > somewhat sizable components they might need some testing after being
> > committed too, so realisticely I think the earliest time I would be able
> to
> > call it release ready is somewhere around oct 13-17.
> >
> > There are a few smaller issues in JIRA too, which some great guys are
> > working on or even have submitted patches for already, so I think it
> looks
> > like we'll have those bits covered.
> >
> >  -- Chris
> >
> > On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com> wrote:
> >
> > > It's not going to happen by the 30th. Issues are open in JIRA, but
> > there's
> > > just far too much work for it to happen in 6 days time.
> > >
> > > On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com>
> > > wrote:
> > >
> > > > Hey folks,
> > > > It's getting close to the proposed Sept 30 release date -- can
> > > > folks enumerate the blocking issues in JIRA (they're all already in
> > JIRA,
> > > > right?), so all contributors have a clear idea ways in which they can
> > > help
> > > > out getting to a complete, stable, 0.8.1-compliant release?
> > > >
> > > > Thanks,
> > > > -Dan
> > > >
> > > > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com>
> wrote:
> > > >
> > > > > Hi everyone,
> > > > >
> > > > > We've been saying for a while that 0.8 completion was a
> prerequisite
> > > for
> > > > > our
> > > > > first release. As we approach this milestone, it's time to really
> get
> > > > > serious about it.
> > > > >
> > > > > To make this happen, we're going to need to do the following:
> > > > >
> > > > > 1. Lock down all public interfaces and signatures. This is critical
> > if
> > > we
> > > > > want to be able to offer any compatibility guarantees.
> > > > >
> > > > > 2. Get rid of rough edges. Now is the time to resolve any
> outstanding
> > > > > integration issues.
> > > > >
> > > > > 3. Lock down a target release date. September 30th gets my vote,
> but
> > > I'm
> > > > > willing to hear arguments otherwise.
> > > > >
> > > > > We can lock down the release into distinct components, as long as
> > > > > compatibility guarantees are met, but we should strive to release
> > > > > everything
> > > > > at around the same time so as to avoid developer confusion.
> > > > >
> > > > > There are 5 major components that need to be released:
> > > > >
> > > > > - javascript (all together, due to interdependencies)
> > > > > - Java/PHP social data component
> > > > > - Java/PHP gadget rendering component
> > > > >
> > > > > I'm not that concerned about the java web app artifact, but that
> > > wouldn't
> > > > > hurt either.
> > > > >
> > > >
> > >
> >
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Dan Peterson <dp...@google.com>.
Thanks for the updates.
How are things going?

I see there are currently 8 "blocker" issues -- is that the set of issues
gating a formal release? If not, can the other issues be added so we have a
clear set of tasks?

-Dan

On Thu, Sep 25, 2008 at 1:08 AM, Chris Chabot <ch...@google.com> wrote:

> On the PHP side of things we have 2 large items still open:
> - JSON-RPC
> - OAuth support for the REST service
>
> The good news is that these are actively being worked on (Joseph Smarr
> doing
> the OAuth bit, and me on JSON-RPC), but the bad news is that with Joseph
> having various engagements in the US, and me doing the Google Developer
> Days
> tour in euope, we really can't commit to having that completed in time for
> a
> 30th release date. Also keep in mind that since they are important and
> somewhat sizable components they might need some testing after being
> committed too, so realisticely I think the earliest time I would be able to
> call it release ready is somewhere around oct 13-17.
>
> There are a few smaller issues in JIRA too, which some great guys are
> working on or even have submitted patches for already, so I think it looks
> like we'll have those bits covered.
>
>  -- Chris
>
> On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com> wrote:
>
> > It's not going to happen by the 30th. Issues are open in JIRA, but
> there's
> > just far too much work for it to happen in 6 days time.
> >
> > On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com>
> > wrote:
> >
> > > Hey folks,
> > > It's getting close to the proposed Sept 30 release date -- can
> > > folks enumerate the blocking issues in JIRA (they're all already in
> JIRA,
> > > right?), so all contributors have a clear idea ways in which they can
> > help
> > > out getting to a complete, stable, 0.8.1-compliant release?
> > >
> > > Thanks,
> > > -Dan
> > >
> > > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com> wrote:
> > >
> > > > Hi everyone,
> > > >
> > > > We've been saying for a while that 0.8 completion was a prerequisite
> > for
> > > > our
> > > > first release. As we approach this milestone, it's time to really get
> > > > serious about it.
> > > >
> > > > To make this happen, we're going to need to do the following:
> > > >
> > > > 1. Lock down all public interfaces and signatures. This is critical
> if
> > we
> > > > want to be able to offer any compatibility guarantees.
> > > >
> > > > 2. Get rid of rough edges. Now is the time to resolve any outstanding
> > > > integration issues.
> > > >
> > > > 3. Lock down a target release date. September 30th gets my vote, but
> > I'm
> > > > willing to hear arguments otherwise.
> > > >
> > > > We can lock down the release into distinct components, as long as
> > > > compatibility guarantees are met, but we should strive to release
> > > > everything
> > > > at around the same time so as to avoid developer confusion.
> > > >
> > > > There are 5 major components that need to be released:
> > > >
> > > > - javascript (all together, due to interdependencies)
> > > > - Java/PHP social data component
> > > > - Java/PHP gadget rendering component
> > > >
> > > > I'm not that concerned about the java web app artifact, but that
> > wouldn't
> > > > hurt either.
> > > >
> > >
> >
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Chris Chabot <ch...@google.com>.
On the PHP side of things we have 2 large items still open:
- JSON-RPC
- OAuth support for the REST service

The good news is that these are actively being worked on (Joseph Smarr doing
the OAuth bit, and me on JSON-RPC), but the bad news is that with Joseph
having various engagements in the US, and me doing the Google Developer Days
tour in euope, we really can't commit to having that completed in time for a
30th release date. Also keep in mind that since they are important and
somewhat sizable components they might need some testing after being
committed too, so realisticely I think the earliest time I would be able to
call it release ready is somewhere around oct 13-17.

There are a few smaller issues in JIRA too, which some great guys are
working on or even have submitted patches for already, so I think it looks
like we'll have those bits covered.

  -- Chris

On Wed, Sep 24, 2008 at 2:00 PM, Kevin Brown <et...@google.com> wrote:

> It's not going to happen by the 30th. Issues are open in JIRA, but there's
> just far too much work for it to happen in 6 days time.
>
> On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com>
> wrote:
>
> > Hey folks,
> > It's getting close to the proposed Sept 30 release date -- can
> > folks enumerate the blocking issues in JIRA (they're all already in JIRA,
> > right?), so all contributors have a clear idea ways in which they can
> help
> > out getting to a complete, stable, 0.8.1-compliant release?
> >
> > Thanks,
> > -Dan
> >
> > On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com> wrote:
> >
> > > Hi everyone,
> > >
> > > We've been saying for a while that 0.8 completion was a prerequisite
> for
> > > our
> > > first release. As we approach this milestone, it's time to really get
> > > serious about it.
> > >
> > > To make this happen, we're going to need to do the following:
> > >
> > > 1. Lock down all public interfaces and signatures. This is critical if
> we
> > > want to be able to offer any compatibility guarantees.
> > >
> > > 2. Get rid of rough edges. Now is the time to resolve any outstanding
> > > integration issues.
> > >
> > > 3. Lock down a target release date. September 30th gets my vote, but
> I'm
> > > willing to hear arguments otherwise.
> > >
> > > We can lock down the release into distinct components, as long as
> > > compatibility guarantees are met, but we should strive to release
> > > everything
> > > at around the same time so as to avoid developer confusion.
> > >
> > > There are 5 major components that need to be released:
> > >
> > > - javascript (all together, due to interdependencies)
> > > - Java/PHP social data component
> > > - Java/PHP gadget rendering component
> > >
> > > I'm not that concerned about the java web app artifact, but that
> wouldn't
> > > hurt either.
> > >
> >
>

Re: Approaching a Shindig release Re: Shindig 1.0 release timeline.

Posted by Kevin Brown <et...@google.com>.
It's not going to happen by the 30th. Issues are open in JIRA, but there's
just far too much work for it to happen in 6 days time.

On Wed, Sep 24, 2008 at 2:45 AM, Dan Peterson <dp...@google.com> wrote:

> Hey folks,
> It's getting close to the proposed Sept 30 release date -- can
> folks enumerate the blocking issues in JIRA (they're all already in JIRA,
> right?), so all contributors have a clear idea ways in which they can help
> out getting to a complete, stable, 0.8.1-compliant release?
>
> Thanks,
> -Dan
>
> On Tue, Aug 26, 2008 at 3:20 AM, Kevin Brown <et...@google.com> wrote:
>
> > Hi everyone,
> >
> > We've been saying for a while that 0.8 completion was a prerequisite for
> > our
> > first release. As we approach this milestone, it's time to really get
> > serious about it.
> >
> > To make this happen, we're going to need to do the following:
> >
> > 1. Lock down all public interfaces and signatures. This is critical if we
> > want to be able to offer any compatibility guarantees.
> >
> > 2. Get rid of rough edges. Now is the time to resolve any outstanding
> > integration issues.
> >
> > 3. Lock down a target release date. September 30th gets my vote, but I'm
> > willing to hear arguments otherwise.
> >
> > We can lock down the release into distinct components, as long as
> > compatibility guarantees are met, but we should strive to release
> > everything
> > at around the same time so as to avoid developer confusion.
> >
> > There are 5 major components that need to be released:
> >
> > - javascript (all together, due to interdependencies)
> > - Java/PHP social data component
> > - Java/PHP gadget rendering component
> >
> > I'm not that concerned about the java web app artifact, but that wouldn't