You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Yaguang Jia (Jira)" <ji...@apache.org> on 2023/02/09 11:39:00 UTC
[jira] [Created] (KYLIN-5437) After the build job is terminated, the total time spent on the job is still calculated
Yaguang Jia created KYLIN-5437:
----------------------------------
Summary: After the build job is terminated, the total time spent on the job is still calculated
Key: KYLIN-5437
URL: https://issues.apache.org/jira/browse/KYLIN-5437
Project: Kylin
Issue Type: Bug
Components: Job Engine
Affects Versions: 5.0-alpha
Reporter: Yaguang Jia
Assignee: Yaguang Jia
Fix For: 5.0-alpha
The total elapsed time is still being calculated when the build task terminates, causing confusion on the user side.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)