Posted to notifications@ofbiz.apache.org by "Swapnil Shah (JIRA)" <ji...@apache.org> on 2016/12/18 06:15:59 UTC

[jira] [Comment Edited] (OFBIZ-7111) Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run

    [ https://issues.apache.org/jira/browse/OFBIZ-7111?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15758299#comment-15758299 ] 

Swapnil Shah edited comment on OFBIZ-7111 at 12/18/16 6:15 AM:
---------------------------------------------------------------

Thanks [~anuj.jain] for the fixes. I have tried to validate the fixes and here are the results:
# Total Actual cost was correctly prorated When product was produced and stocked after completing the production run task (*PASS*)
# The unit cost was set as ZERO, when product was produced and stocked before completing the production run task (this is expected). But when production run task was completed and production got completed then it was expected to calculate and transfer the total Actual cost on already produced item(s) which it didn't. (*FAIL*)

Assigning back to take care of above failing scenario (please refer to attached screenshot for reference)


was (Author: swash78):
Thanks [~anuj.jain] for the fixes. I have tried to validate the fixes and here are the results:
# Total Actual cost was correctly prorated When product was produced and stocked after completing the production run task (*PASS*)
# The unit cost was set as ZERO, when product was produced and stocked before completing the production run task (this is expected). But when production run task was completed and production got completed then it was expected to calculate and transfer the total Actual cost on already produced item(s) which it didn't. (*FAIL*)

Assigning back to take care of above failing scenario

> Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run
> -------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7111
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7111
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: manufacturing
>    Affects Versions: Release Branch 14.12, 14.12.01, Release Branch 15.12, 15.12.01
>            Reporter: Swapnil Shah
>            Assignee: Anuj Jain
>         Attachments: ActualCostXfer_1.png, ActualCostXfer_2.png, OFBIZ-7111.patch, OFBIZ-7111_V2.patch
>
>
> Currently as soon as item is produced into inventory once production run is completed then inventory get created with ZERO unit cost. 
> We could pass on the total actual cost (Material+Labor+Resource etc.) to Produced Item's inventory item i.e. = Total Actual Cost/ Produced in Stock 
> Please refer to attached screenshot for reference



--