You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@giraph.apache.org by "Avery Ching (JIRA)" <ji...@apache.org> on 2014/07/09 05:38:04 UTC

[jira] [Commented] (GIRAPH-917) Every commit is followed by ABORTED: Integrated in Giraph-trunk-Commit

    [ https://issues.apache.org/jira/browse/GIRAPH-917?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14055815#comment-14055815 ] 

Avery Ching commented on GIRAPH-917:
------------------------------------

Good job for pushing on this [~pavanka]!

> Every commit is followed by ABORTED: Integrated in Giraph-trunk-Commit
> ----------------------------------------------------------------------
>
>                 Key: GIRAPH-917
>                 URL: https://issues.apache.org/jira/browse/GIRAPH-917
>             Project: Giraph
>          Issue Type: Task
>            Reporter: Pavan Kumar
>            Assignee: Pavan Kumar
>
> Currently, every continuous build is aborted, because it is taking too long. Shouldn't we reduce the testing time so we can be with in the time limit or have a way to increase the time limits.
> Would be great if some one from PMC can take a look. This issue has been bugging us for very long now. Continuous build has become useless in verifying correctness of commit because of this issue.
> Thanks.



--
This message was sent by Atlassian JIRA
(v6.2#6252)