You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@apex.apache.org by "Sandesh (JIRA)" <ji...@apache.org> on 2016/07/22 15:19:20 UTC
[jira] [Created] (APEXCORE-497) Create a DelayNode for
DelayOperator
Sandesh created APEXCORE-497:
--------------------------------
Summary: Create a DelayNode for DelayOperator
Key: APEXCORE-497
URL: https://issues.apache.org/jira/browse/APEXCORE-497
Project: Apache Apex Core
Issue Type: Improvement
Reporter: Sandesh
One of the design elements I have seen in Apex is, while deploying only required objects are deployed. For example Stream persistence reservoir was created only when it is required. So in the same spirit, we can have the DelayNode for Delay Operators.
Delay Operator related changes happen for the control tuples in GenericNode.
Implementation Idea:
1. Create functions for handling each control tuples in Generic Node
2. DelayNode extends GenericNode
3. Overrides the required functions created in step 1.
4. During deployment based on the operator type, create the required Node.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)