You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues-all@impala.apache.org by "ASF subversion and git services (Jira)" <ji...@apache.org> on 2024/05/06 16:51:00 UTC
[jira] [Commented] (IMPALA-13024) Several tests timeout waiting for admission
[ https://issues.apache.org/jira/browse/IMPALA-13024?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17843792#comment-17843792 ]
ASF subversion and git services commented on IMPALA-13024:
----------------------------------------------------------
Commit 7ca9798949ffd31b703c610e4eca20d0e0181ab3 in impala's branch refs/heads/branch-4.4.0 from Riza Suminto
[ https://gitbox.apache.org/repos/asf?p=impala.git;h=7ca979894 ]
IMPALA-13024: Ignore slots if using default pool and empty group
Slot based admission should not be enabled when using default pool.
There is a bug where coordinator-only query still does slot based
admission because executor group name set to
ClusterMembershipMgr::EMPTY_GROUP_NAME ("empty group (using coordinator
only)"). This patch adds check to recognize coordinator-only query in
default pool and skip slot based admission for it.
Testing:
- Add BE test AdmissionControllerTest.CanAdmitRequestSlotsDefault.
- In test_executor_groups.py, split test_coordinator_concurrency to
test_coordinator_concurrency_default and
test_coordinator_concurrency_two_exec_group_cluster to show the
behavior change.
- Pass core tests in ASAN build.
Change-Id: I0b08dea7ba0c78ac6b98c7a0b148df8fb036c4d0
Reviewed-on: http://gerrit.cloudera.org:8080/21340
Reviewed-by: Impala Public Jenkins <im...@cloudera.com>
Tested-by: Impala Public Jenkins <im...@cloudera.com>
(cherry picked from commit 29e418679380591ea7b8e4bdb797ccdbb0964a3d)
> Several tests timeout waiting for admission
> -------------------------------------------
>
> Key: IMPALA-13024
> URL: https://issues.apache.org/jira/browse/IMPALA-13024
> Project: IMPALA
> Issue Type: Bug
> Reporter: Csaba Ringhofer
> Assignee: Riza Suminto
> Priority: Critical
> Fix For: Impala 4.4.0
>
>
> A bunch of seemingly unrelated tests failed with the following message:
> Example: query_test.test_spilling.TestSpillingDebugActionDimensions.test_spilling_aggs[protocol: beeswax | exec_option: {'mt_dop': 1, 'debug_action': None, 'default_spillable_buffer_size': '256k'} | table_format: parquet/none]
> {code}
> ImpalaBeeswaxException: E Query aborted:Admission for query exceeded timeout 60000ms in pool default-pool. Queued reason: Not enough admission control slots available on host ... . Needed 1 slots but 18/16 are already in use. Additional Details: Not Applicable
> {code}
> This happened in an ASAN build. Another test also failed which may be related to the cause:
> custom_cluster.test_admission_controller.TestAdmissionController.test_queue_reasons_slots
> {code}
> Timeout: query 'e1410add778cd7b0:c40812b900000000' did not reach one of the expected states [4], last known state 5
> {code}
> test_queue_reasons_slots seems to be know flaky test: IMPALA-10338
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-all-unsubscribe@impala.apache.org
For additional commands, e-mail: issues-all-help@impala.apache.org