You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-dev@hadoop.apache.org by "Jiangminghai (Jira)" <ji...@apache.org> on 2021/10/08 02:15:00 UTC
[jira] [Resolved] (YARN-10971) Continuous scheduling reduces
invalid calculations
[ https://issues.apache.org/jira/browse/YARN-10971?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jiangminghai resolved YARN-10971.
---------------------------------
Resolution: Resolved
> Continuous scheduling reduces invalid calculations
> --------------------------------------------------
>
> Key: YARN-10971
> URL: https://issues.apache.org/jira/browse/YARN-10971
> Project: Hadoop YARN
> Issue Type: Improvement
> Components: fairscheduler
> Affects Versions: 2.7.2
> Reporter: Jiangminghai
> Priority: Minor
> Fix For: 2.7.2
>
>
> In FairScheduler#continuousSchedulingAttempt(), nodes has been sorted by available resources,iterate all nodes in continuous scheduling.
> Should break the loop, when *Resources.fitsIn(minimumAllocation,node.getUnallocatedResource()) == false*.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-dev-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-dev-help@hadoop.apache.org