You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ignite.apache.org by "Dmitry Sherstobitov (JIRA)" <ji...@apache.org> on 2018/03/23 13:38:00 UTC
[jira] [Updated] (IGNITE-7786) Changing baseline topology on
cluster may have error in control.sh utility
[ https://issues.apache.org/jira/browse/IGNITE-7786?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dmitry Sherstobitov updated IGNITE-7786:
----------------------------------------
Summary: Changing baseline topology on cluster may have error in control.sh utility (was: Changing baseline topology on big cluster may have error in control.sh utility)
> Changing baseline topology on cluster may have error in control.sh utility
> --------------------------------------------------------------------------
>
> Key: IGNITE-7786
> URL: https://issues.apache.org/jira/browse/IGNITE-7786
> Project: Ignite
> Issue Type: Bug
> Affects Versions: 2.3
> Reporter: Dmitry Sherstobitov
> Priority: Major
>
> Looks like there is hardcoded timeout for waiting result of change baseline operation
> In big cluster there is following behaviour: (154 nodes)
> # Set new baseline topology version
> # Utility connects, but then fails by connection error
> # Cluster successfully activated
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)