You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Piotr Nowojski (Jira)" <ji...@apache.org> on 2020/05/20 07:37:00 UTC

[jira] [Assigned] (FLINK-16165) NestedLoopJoin fallback to HashJoin when build records number is very large

     [ https://issues.apache.org/jira/browse/FLINK-16165?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Piotr Nowojski reassigned FLINK-16165:
--------------------------------------

    Assignee: Jingsong Lee

> NestedLoopJoin fallback to HashJoin when build records number is very large
> ---------------------------------------------------------------------------
>
>                 Key: FLINK-16165
>                 URL: https://issues.apache.org/jira/browse/FLINK-16165
>             Project: Flink
>          Issue Type: Improvement
>          Components: Table SQL / Planner
>            Reporter: Jingsong Lee
>            Assignee: Jingsong Lee
>            Priority: Critical
>             Fix For: 1.11.0
>
>
> Now, if the statistic is not so accurate, maybe choose wrong join type to nested loop join.
> If build records number is very large, this lead to very slow join, the user looks like the join is in Hang.
> It is a stability problem, We should fallback to hash join in runtime to avoid this hang.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)