You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@continuum.apache.org by "Philippe Busque (JIRA)" <ji...@codehaus.org> on 2008/11/28 19:24:19 UTC

[jira] Created: (CONTINUUM-2000) Schedule created through XML-RPC aren't activated upon creation

Schedule created through XML-RPC aren't activated upon creation
---------------------------------------------------------------

                 Key: CONTINUUM-2000
                 URL: http://jira.codehaus.org/browse/CONTINUUM-2000
             Project: Continuum
          Issue Type: Bug
          Components: Core system
    Affects Versions: 1.2.2
            Reporter: Philippe Busque


Upon upgrading to version 1.2.2, I noticed that every job scheduled by a schedule created through a XML-RPC call are never activated.

When the schedule reach its starting time, it is ignored  (no trace in the log).

The only way to activate  a schedule is by either modifying the created schedule through the web interface or restarting the server. Modifying the schedule through the interface actually leave trace in the log that it is being started.

How to reproduce:

Create a new schedule  assign this schedule to a new group build definition and a job, all through the XML-RPC.
Wait for the monitor to start.



-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] Commented: (CONTINUUM-2000) Schedule created through XML-RPC aren't activated upon creation

Posted by "Jose Morales Martinez (JIRA)" <ji...@codehaus.org>.
    [ http://jira.codehaus.org/browse/CONTINUUM-2000?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=182763#action_182763 ] 

Jose Morales Martinez commented on CONTINUUM-2000:
--------------------------------------------------

I think this issue could be related to [CONTINUUM-2195]. 

Your comment that restarting Continuum the schedule is thrown, this is why it is enabled in DB. The problem was that it had to assign a buildDefinition and then edit this schedule.

> Schedule created through XML-RPC aren't activated upon creation
> ---------------------------------------------------------------
>
>                 Key: CONTINUUM-2000
>                 URL: http://jira.codehaus.org/browse/CONTINUUM-2000
>             Project: Continuum
>          Issue Type: Bug
>          Components: Core system
>    Affects Versions: 1.2.2
>            Reporter: Philippe Busque
>
> Upon upgrading to version 1.2.2, I noticed that every job scheduled by a schedule created through a XML-RPC call are never activated.
> When the schedule reach its starting time, it is ignored  (no trace in the log).
> The only way to activate  a schedule is by either modifying the created schedule through the web interface or restarting the server. Modifying the schedule through the interface actually leave trace in the log that it is being started.
> How to reproduce:
> Create a new schedule  assign this schedule to a new group build definition and a job, all through the XML-RPC.
> Wait for the monitor to start.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] Updated: (CONTINUUM-2000) Schedule created through XML-RPC aren't activated upon creation

Posted by "Wendy Smoak (JIRA)" <ji...@codehaus.org>.
     [ http://jira.codehaus.org/browse/CONTINUUM-2000?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Wendy Smoak updated CONTINUUM-2000:
-----------------------------------

    Fix Version/s: Reviewed

Can someone confirm that this is still a problem in 1.3.x and/or trunk?

> Schedule created through XML-RPC aren't activated upon creation
> ---------------------------------------------------------------
>
>                 Key: CONTINUUM-2000
>                 URL: http://jira.codehaus.org/browse/CONTINUUM-2000
>             Project: Continuum
>          Issue Type: Bug
>          Components: Core system
>    Affects Versions: 1.2.2
>            Reporter: Philippe Busque
>             Fix For: Reviewed
>
>
> Upon upgrading to version 1.2.2, I noticed that every job scheduled by a schedule created through a XML-RPC call are never activated.
> When the schedule reach its starting time, it is ignored  (no trace in the log).
> The only way to activate  a schedule is by either modifying the created schedule through the web interface or restarting the server. Modifying the schedule through the interface actually leave trace in the log that it is being started.
> How to reproduce:
> Create a new schedule  assign this schedule to a new group build definition and a job, all through the XML-RPC.
> Wait for the monitor to start.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira