You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@beam.apache.org by "Pei He (JIRA)" <ji...@apache.org> on 2016/08/26 18:34:20 UTC
[jira] [Created] (BEAM-594) Support cancel() and waitUntilFinish()
in FlinkRunnerResult
Pei He created BEAM-594:
---------------------------
Summary: Support cancel() and waitUntilFinish() in FlinkRunnerResult
Key: BEAM-594
URL: https://issues.apache.org/jira/browse/BEAM-594
Project: Beam
Issue Type: New Feature
Components: runner-flink
Reporter: Pei He
We introduced both functions to PipelineResult.
Currently, both of them throw UnsupportedOperationException in Flink runner.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)