You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "ASF GitHub Bot (Jira)" <ji...@apache.org> on 2022/06/20 04:54:00 UTC

[jira] [Work logged] (HIVE-26341) Replication logs & metrics shows last repl id as 0 when number of events is zero

     [ https://issues.apache.org/jira/browse/HIVE-26341?focusedWorklogId=782786&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-782786 ]

ASF GitHub Bot logged work on HIVE-26341:
-----------------------------------------

                Author: ASF GitHub Bot
            Created on: 20/Jun/22 04:53
            Start Date: 20/Jun/22 04:53
    Worklog Time Spent: 10m 
      Work Description: hmangla98 commented on PR #3387:
URL: https://github.com/apache/hive/pull/3387#issuecomment-1159970708

   Prior to this patch, whenever there are no events to load, lastReplId in RM is shown as 0 which is not corresponding to repl.last.id of the target database.
   <img width="1320" alt="Screenshot 2022-06-20 at 10 19 54 AM" src="https://user-images.githubusercontent.com/79496857/174527462-13dbc03b-2ef3-4896-8dec-aa32a4ee244b.png">
   
   Post this patch, lastReplId is in sync with repl.last.id of target db. Below is the sample run for same scenario where lastReplId is correctly updated.
   <img width="1320" alt="Screenshot 2022-06-20 at 10 20 08 AM" src="https://user-images.githubusercontent.com/79496857/174527699-975d31a0-7128-4e0f-811f-9c9ce53cc7ca.png">
   
   




Issue Time Tracking
-------------------

            Worklog Id:     (was: 782786)
    Remaining Estimate: 0h
            Time Spent: 10m

> Replication logs & metrics shows last repl id as 0 when number of events is zero
> --------------------------------------------------------------------------------
>
>                 Key: HIVE-26341
>                 URL: https://issues.apache.org/jira/browse/HIVE-26341
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Haymant Mangla
>            Assignee: Haymant Mangla
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 10m
>  Remaining Estimate: 0h
>




--
This message was sent by Atlassian Jira
(v8.20.7#820007)