You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Thomas Mueller (JIRA)" <ji...@apache.org> on 2017/03/22 14:50:41 UTC
[jira] [Created] (OAK-5970) (Re-)Indexing: estimate progress / ETA
Thomas Mueller created OAK-5970:
-----------------------------------
Summary: (Re-)Indexing: estimate progress / ETA
Key: OAK-5970
URL: https://issues.apache.org/jira/browse/OAK-5970
Project: Jackrabbit Oak
Issue Type: New Feature
Components: query
Reporter: Thomas Mueller
Assignee: Thomas Mueller
Fix For: 1.8
Reindexing can take a long time, so it would be good if we can estimate where we are at (for example in percent of the relevant number of nodes). It might also be possible to estimate when indexing will be done, and the current path.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)