You are viewing a plain text version of this content. The canonical link for it is here.
Posted to hdfs-issues@hadoop.apache.org by "ASF GitHub Bot (Jira)" <ji...@apache.org> on 2026/05/08 07:48:00 UTC

[jira] [Commented] (HDFS-17685) Option to explicitly choose DFS client lease renewal interval

    [ https://issues.apache.org/jira/browse/HDFS-17685?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=18079359#comment-18079359 ] 

ASF GitHub Bot commented on HDFS-17685:
---------------------------------------

charlesconnell opened a new pull request, #7215:
URL: https://github.com/apache/hadoop/pull/7215

   <!--
     Thanks for sending a pull request!
       1. If this is your first time, please read our contributor guidelines: https://cwiki.apache.org/confluence/display/HADOOP/How+To+Contribute
       2. Make sure your PR title starts with JIRA issue id, e.g., 'HADOOP-17799. Your PR title ...'.
   -->
   
   ### Description of PR
   
   Currently, DFSClients send lease renewals to the NameNode at an interval equal to half of `ipc.client.rpc-timeout.ms`. This logic dates back to 2009 in [HDFS-278](https://issues.apache.org/jira/browse/HDFS-278). At my company, we are interested in using short DFS client timeouts (< 10 seconds). However, we're currently hesitant to do so because that would flood the NameNode with lease renewals.
   
   I propose a setting `dfs.client.lease.renewal.interval.ms` that, if nonzero, would be used as the lease renewal interval instead of `ipc.client.rpc-timeout.ms / 2`. This would be useful for advanced users that want to control their RPC timeout and lease renewals separately.
   
   ### How was this patch tested?
   
   Unit tests are included in this PR for the new logic. I have also tested the new feature in my company's HBase infrastructure.
   
   
   ### For code changes:
   
   - [x] Does the title or this PR starts with the corresponding JIRA issue id (e.g. 'HADOOP-17799. Your PR title ...')?
   - [ ] ~Object storage: have the integration tests been executed and the endpoint declared according to the connector-specific documentation?~ not applicable
   - [ ] ~If adding new dependencies to the code, are these dependencies licensed in a way that is compatible for inclusion under [ASF 2.0](http://www.apache.org/legal/resolved.html#category-a)?~ not applicable
   - [ ] ~If applicable, have you updated the `LICENSE`, `LICENSE-binary`, `NOTICE-binary` files?~ not applicable
   
   




> Option to explicitly choose DFS client lease renewal interval
> -------------------------------------------------------------
>
>                 Key: HDFS-17685
>                 URL: https://issues.apache.org/jira/browse/HDFS-17685
>             Project: Hadoop HDFS
>          Issue Type: Improvement
>          Components: dfsclient
>            Reporter: Charles Connell
>            Priority: Minor
>              Labels: pull-request-available
>
> Currently, DFSClients send lease renewals to the NameNode at an interval equal to half of {{ipc.client.rpc-timeout.ms}}. This logic dates back to 2009 in HDFS-278. At my company, we are interested in using short DFS client timeouts (< 10 seconds). However, we're currently hesitant to do so because that would flood the NameNode with lease renewals.
> I propose a setting {{dfs.client.lease.renewal.interval.ms}} that, if nonzero, would be used as the lease renewal interval instead of {{ipc.client.rpc-timeout.ms / 2}}. This would be useful for advanced users that want to control their RPC timeout and lease renewals separately.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: hdfs-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: hdfs-issues-help@hadoop.apache.org