You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@jmeter.apache.org by bu...@apache.org on 2016/08/07 20:45:46 UTC
[Bug 59956] New: Web Report / Dashboard : Add ability to generate a
graph for a range of data
https://bz.apache.org/bugzilla/show_bug.cgi?id=59956
Bug ID: 59956
Summary: Web Report / Dashboard : Add ability to generate a
graph for a range of data
Product: JMeter
Version: 3.0
Hardware: All
OS: All
Status: NEW
Severity: enhancement
Priority: P2
Component: Main
Assignee: issues@jmeter.apache.org
Reporter: p.mouawad@ubik-ingenierie.com
This feature will add 2 properties:
# Date range start date at format dd/MM/yyyy HH:mm:ss
#jmeter.reportgenerator.start_date=
# Date range end date at format dd/MM/yyyy HH:mm:ss
#jmeter.reportgenerator.end_date=
None, one of them or both can be used to reduce the range of data to generate
the Web report.
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 59956] Web Report / Dashboard : Add ability to generate a graph
for a range of data
Posted by bu...@apache.org.
https://bz.apache.org/bugzilla/show_bug.cgi?id=59956
Philippe Mouawad <p....@ubik-ingenierie.com> changed:
What |Removed |Added
----------------------------------------------------------------------------
CC| |p.mouawad@ubik-ingenierie.c
| |om
Status|NEW |RESOLVED
Resolution|--- |FIXED
--- Comment #1 from Philippe Mouawad <p....@ubik-ingenierie.com> ---
Author: pmouawad
Date: Sun Aug 7 20:53:07 2016
New Revision: 1755459
URL: http://svn.apache.org/viewvc?rev=1755459&view=rev
Log:
Bug 59956 - Web Report / Dashboard : Add ability to generate a graph for a
range of data
Bugzilla Id: 59956
Modified:
jmeter/trunk/bin/reportgenerator.properties
jmeter/trunk/bin/user.properties
jmeter/trunk/src/core/org/apache/jmeter/report/config/ReportGeneratorConfiguration.java
jmeter/trunk/src/core/org/apache/jmeter/report/dashboard/ReportGenerator.java
jmeter/trunk/xdocs/changes.xml
jmeter/trunk/xdocs/usermanual/generating-dashboard.xml
--
You are receiving this mail because:
You are the assignee for the bug.
[Bug 59956] Web Report / Dashboard : Add ability to generate a graph
for a range of data
Posted by bu...@apache.org.
https://bz.apache.org/bugzilla/show_bug.cgi?id=59956
--- Comment #2 from Philippe Mouawad <p....@ubik-ingenierie.com> ---
Author: pmouawad
Date: Fri Sep 2 19:36:44 2016
New Revision: 1759023
URL: http://svn.apache.org/viewvc?rev=1759023&view=rev
Log:
Bug 59956 - Web Report / Dashboard : Add ability to generate a graph for a
range of data
Replace date format by one without separator for easier use from command line
Bugzilla Id: 59956
Modified:
jmeter/trunk/bin/user.properties
jmeter/trunk/src/core/org/apache/jmeter/report/config/ReportGeneratorConfiguration.java
jmeter/trunk/xdocs/usermanual/generating-dashboard.xml
--
You are receiving this mail because:
You are the assignee for the bug.