You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@accumulo.apache.org by "Keith Turner (JIRA)" <ji...@apache.org> on 2012/10/04 04:11:07 UTC

[jira] [Assigned] (ACCUMULO-779) ZooStore can starve completed Repos

     [ https://issues.apache.org/jira/browse/ACCUMULO-779?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Keith Turner reassigned ACCUMULO-779:
-------------------------------------

    Assignee: Keith Turner  (was: Eric Newton)
    
> ZooStore can starve completed Repos
> -----------------------------------
>
>                 Key: ACCUMULO-779
>                 URL: https://issues.apache.org/jira/browse/ACCUMULO-779
>             Project: Accumulo
>          Issue Type: Bug
>          Components: master
>    Affects Versions: 1.4.1, 1.4.0
>            Reporter: Eric Newton
>            Assignee: Keith Turner
>             Fix For: 1.5.0, 1.4.2
>
>
> A user aggressively used the compactrange command.  This queued dozens of Repos in zookeeper.  Pulling new Repos from zookeeper is fairly slow.  Checking if they are ready, is also slow.  The threads running the Repos would not finish getting through the list of Repos, some of which had finished, before the first item in the list was ready to be checked again.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira