You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Varun Vasudev (JIRA)" <ji...@apache.org> on 2015/11/11 11:49:11 UTC
[jira] [Created] (YARN-4344) NMs reconnecting with changed
capabilities can lead to wrong cluster resource calculations
Varun Vasudev created YARN-4344:
-----------------------------------
Summary: NMs reconnecting with changed capabilities can lead to wrong cluster resource calculations
Key: YARN-4344
URL: https://issues.apache.org/jira/browse/YARN-4344
Project: Hadoop YARN
Issue Type: Bug
Components: resourcemanager
Affects Versions: 2.6.2, 2.7.1
Reporter: Varun Vasudev
Assignee: Varun Vasudev
Priority: Critical
After YARN-3802, if an NM re-connects to the RM with changed capabilities, there can arise situations where the overall cluster resource calculation for the cluster will be incorrect leading to inconsistencies in scheduling.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)