You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@isis.apache.org by ah...@apache.org on 2022/09/09 04:36:22 UTC

[isis] branch master updated (7eb82f8a23 -> 6b52466925)

This is an automated email from the ASF dual-hosted git repository.

ahuber pushed a change to branch master
in repository https://gitbox.apache.org/repos/asf/isis.git


    from 7eb82f8a23 Merge pull request #1087 from apache/dependabot/maven/master/cucumber.version-7.7.0
     add 4d35d6a6d2 Bump fullcalendar from 5.10.2 to 5.11.3
     new 6b52466925 Merge pull request #1088 from apache/dependabot/maven/master/org.webjars-fullcalendar-5.11.3

The 1 revisions listed above as "new" are entirely new to this
repository and will be described in separate emails.  The revisions
listed as "add" were already present in the repository and have only
been added to this reference.


Summary of changes:
 extensions/vw/fullcalendar/wicket/integration/pom.xml | 2 +-
 1 file changed, 1 insertion(+), 1 deletion(-)


[isis] 01/01: Merge pull request #1088 from apache/dependabot/maven/master/org.webjars-fullcalendar-5.11.3

Posted by ah...@apache.org.
This is an automated email from the ASF dual-hosted git repository.

ahuber pushed a commit to branch master
in repository https://gitbox.apache.org/repos/asf/isis.git

commit 6b52466925fe536f9ceafd3bbd2ab4fbc047b87d
Merge: 7eb82f8a23 4d35d6a6d2
Author: Andi Huber <ah...@apache.org>
AuthorDate: Fri Sep 9 06:36:17 2022 +0200

    Merge pull request #1088 from apache/dependabot/maven/master/org.webjars-fullcalendar-5.11.3
    
    Bump fullcalendar from 5.10.2 to 5.11.3

 extensions/vw/fullcalendar/wicket/integration/pom.xml | 2 +-
 1 file changed, 1 insertion(+), 1 deletion(-)