You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@kylin.apache.org by "mouxingya (JIRA)" <ji...@apache.org> on 2019/05/17 05:21:00 UTC
[jira] [Created] (KYLIN-4007) kylin并发构建全局字典时间过长
mouxingya created KYLIN-4007:
--------------------------------
Summary: kylin并发构建全局字典时间过长
Key: KYLIN-4007
URL: https://issues.apache.org/jira/browse/KYLIN-4007
Project: Kylin
Issue Type: Bug
Components: Job Engine
Affects Versions: v2.6.1
Reporter: mouxingya
Attachments: WechatIMG20.png
When a dimension (user_id) is accurately calculated at the same time, the original data is in the order of millions, and the rowkey has the encoding type fixed_lengrh and length 100. It took a few hours or even failed in the build dimension dictionary step. After investigation, it was found that there are concurrent processes that want to obtain the lock corresponding to the cube / dict path, resulting in a deadlock.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)