You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Till Rohrmann (JIRA)" <ji...@apache.org> on 2018/11/02 12:55:00 UTC

[jira] [Closed] (FLINK-10747) CoGroupConnectedComponentsITCase deadlocked on Travis

     [ https://issues.apache.org/jira/browse/FLINK-10747?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Till Rohrmann closed FLINK-10747.
---------------------------------
    Resolution: Fixed

Fixed by reverting FLINK-10727: 344df74025f519d1e25ab6764d7fe863bab78870

> CoGroupConnectedComponentsITCase deadlocked on Travis
> -----------------------------------------------------
>
>                 Key: FLINK-10747
>                 URL: https://issues.apache.org/jira/browse/FLINK-10747
>             Project: Flink
>          Issue Type: Bug
>          Components: Tests
>    Affects Versions: 1.7.0
>            Reporter: Till Rohrmann
>            Assignee: Till Rohrmann
>            Priority: Blocker
>              Labels: pull-request-available, test-stability
>             Fix For: 1.7.0
>
>
> The {{CoGroupConnectedComponentsITCase}} deadlocks on Travis: https://api.travis-ci.org/v3/job/449230962/log.txt.
> It looks as if the iteration gets stuck and waits {{SuperstepKickoffLatch.awaitStartOfSuperstepOrTermination}} without ever getting a proper notification. This might indicate a serious bug in our iteration implementation. This could also be related to FLINK-10741.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)