You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@aurora.apache.org by "Joshua Cohen (JIRA)" <ji...@apache.org> on 2015/10/26 19:54:27 UTC

[jira] [Updated] (AURORA-1528) New snooze feature

     [ https://issues.apache.org/jira/browse/AURORA-1528?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Joshua Cohen updated AURORA-1528:
---------------------------------
    Component/s: Scheduler

> New snooze feature
> ------------------
>
>                 Key: AURORA-1528
>                 URL: https://issues.apache.org/jira/browse/AURORA-1528
>             Project: Aurora
>          Issue Type: Story
>          Components: Scheduler
>            Reporter: Thomas Sun
>
> something that would fulfill my need would be in the next d:h:m:s(days:hours:minutes:seconds) from NOW, 
> do not run(or skip running) the job even though it may be scheduled to run for x times within that time range.
> if a job is scheduled to run at T0, T6, T12, T18 UTC everyday, and I did a snooze 0:8:0:0 for this job at UTC T16, then the next 2 runs(T18 today and T0 tomorrow) of the job should be skipped.
> another useful interface for me would be snooze x -> x is the number of runs from NOW to skip.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)