You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues-all@impala.apache.org by "Tim Armstrong (JIRA)" <ji...@apache.org> on 2019/08/10 00:10:00 UTC

[jira] [Work started] (IMPALA-8850) TmpFileMgrTest.TestDirectoryLimitParsing failed in asf-master build with error "Value of: dirs3.size() Actual: 3 Expected: 4"

     [ https://issues.apache.org/jira/browse/IMPALA-8850?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Work on IMPALA-8850 started by Tim Armstrong.
---------------------------------------------
> TmpFileMgrTest.TestDirectoryLimitParsing failed in asf-master build with error "Value of: dirs3.size()   Actual: 3 Expected: 4"
> -------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: IMPALA-8850
>                 URL: https://issues.apache.org/jira/browse/IMPALA-8850
>             Project: IMPALA
>          Issue Type: Bug
>          Components: Backend
>    Affects Versions: Impala 3.3.0
>            Reporter: Xiaomeng Zhang
>            Assignee: Tim Armstrong
>            Priority: Blocker
>              Labels: broken-build
>
> {code:java}
> Error Message
> Value of: dirs3.size()   Actual: 3 Expected: 4
> Stacktrace
> /data/jenkins/workspace/impala-asf-master-core-asan/repos/Impala/be/src/runtime/tmp-file-mgr-test.cc:834
> Value of: dirs3.size()
>   Actual: 3
> Expected: 4
> {code}
> Looks like due to commit [https://github.com/apache/impala/commit/411189a8d733a66c363c72f8c404123d68640a3e]



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

---------------------------------------------------------------------
To unsubscribe, e-mail: issues-all-unsubscribe@impala.apache.org
For additional commands, e-mail: issues-all-help@impala.apache.org