Posted to dev@roller.apache.org by Allen Gilliland <al...@sun.com> on 2007/07/24 00:49:54 UTC

issues with scheduled tasks: ROL-1294, ROL-1446

There are currently a couple of issues open regarding the way background 
tasks are run and i have some thoughts on how to fix them but need input 
on a couple of things.  I'm going to break things down by issue ...

1. Task leasing causes "time drifting" problems in scheduled tasks. 
ROL-1446.

This is actually a bit tough to explain, but basically the problem is 
that it takes some amount of time between when a task starts on a thread 
and when it actually obtains a lease in the db and by not accounting for 
that in our leasing checks we are causing problems with task running. 
i.e. assume a task starts at midnight every night but obtains a lease 5 
seconds after midnight on day 1.  then on day 2 if it tries to obtain 
that lease only 2 seconds after midnight it will fail because the full 
24hrs of task interval time has not elapsed yet.  This is pretty easy to 
replicate by setting a task with interval = 1 and letting it run for a 
while with DEBUG logging enabled.

To fix this problem we basically need to calculate the next allowed run 
time for tasks using a time value other than the recorded lease 
acquisition times.  We already have a "lastrun" column in the tasklock 
table which can be used for this so the real key is to make sure that 
column accurately reflects the expected time a task is supposed to run, 
not the real time a task runs which is always going to have some 
fractional amount of processing time added to it.  i.e. if a task is 
supposed to run daily at midnight then the lastrun time should always be 
00:00:00.000 on a given date rather than 00:00:00.334 or 00:00:01.121, 
etc, etc.


2. Tasks should be configured in a central location, not per node.

Generally speaking this would only affect people running Roller in a 
cluster, but it makes no real sense to allow task scheduling to be 
configured independently per node in a cluster because the scheduling is 
required to be synchronized across all nodes.  i.e. if nodeA wants to 
run every 15 minutes and nodeB wants to run every 10 minutes then if 
nodeA runs 10 minutes after the last run time for the task should it 
execute?

In any case, that is a bit of a mess and the proper thing to do is to 
ensure that all task scheduling is configured in one place (the db) and 
all nodes can just read their config from there and schedule themselves 
accordingly.  The other major benefit here is that it's easier for 
admins to see all the available tasks and decide which ones to run and 
at what intervals since we would do it all in a GUI rather than a config 
file.  And of course, with a GUI we can also report status, so that 
admins could see when tasks last ran, etc.

So, to fix this part of the problem we would basically need to take the 
current task configuration properties that are done via config file and 
put them in the db in the roller_tasklock table, which would include 4 
new columns for ... "enabled", "starttime", "interval", and 
"leaseduration".  We would then also need to setup a new page on the 
admin UI menu for viewing the tasks and altering their settings.

I didn't really want to make any more changes like this for 4.0, but the 
current process is broken and so far this looks like the most 
appropriate thing to do.  I don't think this is a whole lot of work 
since the task stuff is fairly independent and doesn't affect any other 
pieces of the code, so we are really just talking about adding a few 
things to the pojo and a new struts2 action & jsp.

I should also note that this will help out with #1 because it'll make it 
easier and more consistent to be able to track the expected run time of 
each task.


3. Synchronize task scheduling against a single clock (the db). ROL-1294.

This one I am less inclined to do, but technically it still makes a fair 
amount of sense.  The reason this one is an issue is because the way 
that tasks are run is based on multiple independent schedulers, one per 
node in a cluster, and with various schedulers the task running can get 
out of sync.  Schedulers can get out of sync in a couple of ways ...

First is just typical system clock drifting.  If you have 3 machines, A 
and B which are application nodes and C which is the db then all 3 need 
to be in perfect time sync for scheduling to stay consistent across the 
app.  If any of the clocks on these systems becomes fast or slow it can 
cause the tasks to not run at their scheduled times or to miss acquiring 
leases because a tasks interval time hasn't elapsed properly.  This is 
relatively unlikely to occur, but it is a concern.

Second, and more likely, is that if you reconfigure the task schedules 
via a UI as described in #2 or even just by config file then the 
schedulers for other nodes will be out of sync.

To accomplish this one I think we would have to do our own scheduling 
based off the database time, so we would start up a thread in the 
application which would check once per minute if it was time to run any 
tasks and if so it would start the tasks on new threads.  Not entirely 
complicated, but it's still new code.


4. Tasks mysteriously stop running.

This one I have no info about other than to say I have very regularly 
seen a problem where a task will stop running and for no apparent 
reason.  i.e. no errors in logs or anything, it just stops running. 
Through some debugging I have noted that it seems that when this happens 
the task is not even being started on a thread, so it's as if the task 
gets dropped from the scheduler all together because there is no 
debugging available indicating the task even tried to start.

This would be the main thing that would drive me to want to do #3 
assuming I can't figure out why the tasks mysteriously stop running.


So that's all the issues and a summary of proposed solutions.  My 
feeling is that #1 is critical and has to be fixed for 4.0 somehow, #2 
is a good thing that I'd like to see but I think we could technically do 
without it, #3 is nice but if I could avoid doing it I would, and #4 is 
critical and has to be fixed for 4.0.

Thoughts?  Comments?  Opinions?

I am trying to wrap up 4.0 work ASAP so please respond as soon as 
possible because I am already beginning to work on these things.

-- Allen


Re: issues with scheduled tasks: ROL-1294, ROL-1446

Posted by Allen Gilliland <al...@sun.com>.
Okay, since nobody else seems to have an opinion, then what I plan to 
commit next is a fix for the time drifting problem with the leasing 
process and a custom scheduler.  Here's a few details ...

1. To fix the problem with the time drifting in the leasing process I've 
changed the logic for the task running so that we keep track of a last 
run time for each task and base the next allowed run time on that date. 
  So effectively, the time involved in the leasing process does not 
affect the scheduling for tasks.

2. To fix the problem with tasks mysteriously running at the wrong time 
or failing to run for unexplained reasons I've created a custom 
scheduler.  It's a fairly simple class which gets run on its own thread 
and once per minute it wakes up, checks if any tasks need to be 
launched, then goes back to sleep until the next minute.  It also 
contains a couple bits of custom logic which is more unique to our task 
running process.

I haven't done anything to push the task configuration and controls into 
the db yet, so I am still deciding on that.  I still think it's the best 
thing to do, it's just a matter if if I have time to do it.

-- Allen


Dave wrote:
> On 7/23/07, Allen Gilliland <al...@sun.com> wrote:
>> So that's all the issues and a summary of proposed solutions.  My
>> feeling is that #1 is critical and has to be fixed for 4.0 somehow, #2
>> is a good thing that I'd like to see but I think we could technically do
>> without it, #3 is nice but if I could avoid doing it I would, and #4 is
>> critical and has to be fixed for 4.0.
>>
>> Thoughts?  Comments?  Opinions?
>>
>> I am trying to wrap up 4.0 work ASAP so please respond as soon as
>> possible because I am already beginning to work on these things.
> 
> I wish I could help more, but I'm not familiar enough with the
> scheduled task subsystem to really make an intelligent comment at this
> time.
> 
> If you need to make database and UI changes to address this problem,
> I'm +1 -- this is a critical feature for folks using the planet
> subsystem.
> 
> - Dave

Re: issues with scheduled tasks: ROL-1294, ROL-1446

Posted by Dave <sn...@gmail.com>.
On 7/23/07, Allen Gilliland <al...@sun.com> wrote:
> So that's all the issues and a summary of proposed solutions.  My
> feeling is that #1 is critical and has to be fixed for 4.0 somehow, #2
> is a good thing that I'd like to see but I think we could technically do
> without it, #3 is nice but if I could avoid doing it I would, and #4 is
> critical and has to be fixed for 4.0.
>
> Thoughts?  Comments?  Opinions?
>
> I am trying to wrap up 4.0 work ASAP so please respond as soon as
> possible because I am already beginning to work on these things.

I wish I could help more, but I'm not familiar enough with the
scheduled task subsystem to really make an intelligent comment at this
time.

If you need to make database and UI changes to address this problem,
I'm +1 -- this is a critical feature for folks using the planet
subsystem.

- Dave

Re: issues with scheduled tasks: ROL-1294, ROL-1446

Posted by Allen Gilliland <al...@sun.com>.
A bit of an update based on some prototype work that I did yesterday and 
tested over night ...

The use of the java.util.concurrent.ScheduledExecutorService to running 
the tasks is looking more and more iffy.  I did some cleanup on the code 
yesterday and ran it overnight with debugging enabled and for a while 
things looked like they were working great, but then randomly the 
scheduler moved the execution time of the tasks forward by 1.4 seconds ...

DEBUG 2007-07-24 05:54:00,000 RollerTaskWithLeasing:run - Attempting to 
acquire
lease
DEBUG 2007-07-24 05:54:00,001 RollerTaskWithLeasing:run - Attempting to 
acquire
lease


DEBUG 2007-07-24 05:54:58,600 RollerTaskWithLeasing:run - Attempting to 
acquire
lease
DEBUG 2007-07-24 05:54:58,600 RollerTaskWithLeasing:run - Attempting to 
acquire
lease

I then did some poking around on forums, etc and found that the 
ScheduledExecutorService is not held in particularly high regard, even 
by the JSR team which added those utilities.  This post in the forums by 
David Holmes (one of the JSR 166 expert group members) has me feeling 
uneasy ... "ScheduledThreadPoolExecutor has a number of nasty bugs - one 
of which is that cancelling tasks tends to terminate the pool thread. 
You should never run out of threads but you may run with fewer than 
expected threads and incur extra thread creation/teardown overhead."

In light of this info it's looking like doing #3 below, basically doing 
our own scheduler synchronized against the db time may be the best option.

-- Allen


Allen Gilliland wrote:
> There are currently a couple of issues open regarding the way background 
> tasks are run and i have some thoughts on how to fix them but need input 
> on a couple of things.  I'm going to break things down by issue ...
> 
> 1. Task leasing causes "time drifting" problems in scheduled tasks. 
> ROL-1446.
> 
> This is actually a bit tough to explain, but basically the problem is 
> that it takes some amount of time between when a task starts on a thread 
> and when it actually obtains a lease in the db and by not accounting for 
> that in our leasing checks we are causing problems with task running. 
> i.e. assume a task starts at midnight every night but obtains a lease 5 
> seconds after midnight on day 1.  then on day 2 if it tries to obtain 
> that lease only 2 seconds after midnight it will fail because the full 
> 24hrs of task interval time has not elapsed yet.  This is pretty easy to 
> replicate by setting a task with interval = 1 and letting it run for a 
> while with DEBUG logging enabled.
> 
> To fix this problem we basically need to calculate the next allowed run 
> time for tasks using a time value other than the recorded lease 
> acquisition times.  We already have a "lastrun" column in the tasklock 
> table which can be used for this so the real key is to make sure that 
> column accurately reflects the expected time a task is supposed to run, 
> not the real time a task runs which is always going to have some 
> fractional amount of processing time added to it.  i.e. if a task is 
> supposed to run daily at midnight then the lastrun time should always be 
> 00:00:00.000 on a given date rather than 00:00:00.334 or 00:00:01.121, 
> etc, etc.
> 
> 
> 2. Tasks should be configured in a central location, not per node.
> 
> Generally speaking this would only affect people running Roller in a 
> cluster, but it makes no real sense to allow task scheduling to be 
> configured independently per node in a cluster because the scheduling is 
> required to be synchronized across all nodes.  i.e. if nodeA wants to 
> run every 15 minutes and nodeB wants to run every 10 minutes then if 
> nodeA runs 10 minutes after the last run time for the task should it 
> execute?
> 
> In any case, that is a bit of a mess and the proper thing to do is to 
> ensure that all task scheduling is configured in one place (the db) and 
> all nodes can just read their config from there and schedule themselves 
> accordingly.  The other major benefit here is that it's easier for 
> admins to see all the available tasks and decide which ones to run and 
> at what intervals since we would do it all in a GUI rather than a config 
> file.  And of course, with a GUI we can also report status, so that 
> admins could see when tasks last ran, etc.
> 
> So, to fix this part of the problem we would basically need to take the 
> current task configuration properties that are done via config file and 
> put them in the db in the roller_tasklock table, which would include 4 
> new columns for ... "enabled", "starttime", "interval", and 
> "leaseduration".  We would then also need to setup a new page on the 
> admin UI menu for viewing the tasks and altering their settings.
> 
> I didn't really want to make any more changes like this for 4.0, but the 
> current process is broken and so far this looks like the most 
> appropriate thing to do.  I don't think this is a whole lot of work 
> since the task stuff is fairly independent and doesn't affect any other 
> pieces of the code, so we are really just talking about adding a few 
> things to the pojo and a new struts2 action & jsp.
> 
> I should also note that this will help out with #1 because it'll make it 
> easier and more consistent to be able to track the expected run time of 
> each task.
> 
> 
> 3. Synchronize task scheduling against a single clock (the db). ROL-1294.
> 
> This one I am less inclined to do, but technically it still makes a fair 
> amount of sense.  The reason this one is an issue is because the way 
> that tasks are run is based on multiple independent schedulers, one per 
> node in a cluster, and with various schedulers the task running can get 
> out of sync.  Schedulers can get out of sync in a couple of ways ...
> 
> First is just typical system clock drifting.  If you have 3 machines, A 
> and B which are application nodes and C which is the db then all 3 need 
> to be in perfect time sync for scheduling to stay consistent across the 
> app.  If any of the clocks on these systems becomes fast or slow it can 
> cause the tasks to not run at their scheduled times or to miss acquiring 
> leases because a tasks interval time hasn't elapsed properly.  This is 
> relatively unlikely to occur, but it is a concern.
> 
> Second, and more likely, is that if you reconfigure the task schedules 
> via a UI as described in #2 or even just by config file then the 
> schedulers for other nodes will be out of sync.
> 
> To accomplish this one I think we would have to do our own scheduling 
> based off the database time, so we would start up a thread in the 
> application which would check once per minute if it was time to run any 
> tasks and if so it would start the tasks on new threads.  Not entirely 
> complicated, but it's still new code.
> 
> 
> 4. Tasks mysteriously stop running.
> 
> This one I have no info about other than to say I have very regularly 
> seen a problem where a task will stop running and for no apparent 
> reason.  i.e. no errors in logs or anything, it just stops running. 
> Through some debugging I have noted that it seems that when this happens 
> the task is not even being started on a thread, so it's as if the task 
> gets dropped from the scheduler all together because there is no 
> debugging available indicating the task even tried to start.
> 
> This would be the main thing that would drive me to want to do #3 
> assuming I can't figure out why the tasks mysteriously stop running.
> 
> 
> So that's all the issues and a summary of proposed solutions.  My 
> feeling is that #1 is critical and has to be fixed for 4.0 somehow, #2 
> is a good thing that I'd like to see but I think we could technically do 
> without it, #3 is nice but if I could avoid doing it I would, and #4 is 
> critical and has to be fixed for 4.0.
> 
> Thoughts?  Comments?  Opinions?
> 
> I am trying to wrap up 4.0 work ASAP so please respond as soon as 
> possible because I am already beginning to work on these things.
> 
> -- Allen
>