You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@nifi.apache.org by "Peter Wicks (JIRA)" <ji...@apache.org> on 2019/02/01 20:07:01 UTC
[jira] [Resolved] (NIFI-5722) Expose Penalty Remaining Duration
[ https://issues.apache.org/jira/browse/NIFI-5722?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Peter Wicks resolved NIFI-5722.
-------------------------------
Resolution: Fixed
> Expose Penalty Remaining Duration
> ---------------------------------
>
> Key: NIFI-5722
> URL: https://issues.apache.org/jira/browse/NIFI-5722
> Project: Apache NiFi
> Issue Type: New Feature
> Components: Core Framework, Core UI
> Reporter: Peter Wicks
> Assignee: Peter Wicks
> Priority: Minor
> Attachments: FlowFIleDetailsWithPenaltyTime.PNG, QueueWithPenaltyTime.PNG
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> When a FlowFile is penalized a user is only able to see that it is penalized in List Queue and FlowFile details, but not for how much longer the FlowFile will be penalized.
> The List Queue details need to show remaining penalty duration, along with the FlowFile details. This should replace the existing 'Yes' value.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)