You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@beam.apache.org by "Kyle Weaver (Jira)" <ji...@apache.org> on 2019/12/23 16:27:00 UTC

[jira] [Created] (BEAM-9021) Flink portable runner postcommit times out

Kyle Weaver created BEAM-9021:
---------------------------------

             Summary: Flink portable runner postcommit times out
                 Key: BEAM-9021
                 URL: https://issues.apache.org/jira/browse/BEAM-9021
             Project: Beam
          Issue Type: Improvement
          Components: runner-flink, test-failures
            Reporter: Kyle Weaver
            Assignee: Kyle Weaver


Build times appear to be inconsistent, with some builds taking 10-30 mins and others timing out at 2 hours.

https://builds.apache.org/job/beam_PostCommit_PortableJar_Flink/buildTimeTrend



--
This message was sent by Atlassian Jira
(v8.3.4#803005)