You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Weiwei Yang (JIRA)" <ji...@apache.org> on 2018/09/19 11:55:00 UTC
***UNCHECKED*** [jira] [Updated] (YARN-8771) CapacityScheduler fails
to unreserve when cluster resource contains empty resource type
[ https://issues.apache.org/jira/browse/YARN-8771?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Weiwei Yang updated YARN-8771:
------------------------------
Fix Version/s: (was: 3.0.4)
> CapacityScheduler fails to unreserve when cluster resource contains empty resource type
> ---------------------------------------------------------------------------------------
>
> Key: YARN-8771
> URL: https://issues.apache.org/jira/browse/YARN-8771
> Project: Hadoop YARN
> Issue Type: Bug
> Components: capacityscheduler
> Affects Versions: 3.2.0
> Reporter: Tao Yang
> Assignee: Tao Yang
> Priority: Critical
> Fix For: 3.2.0, 3.1.2
>
> Attachments: YARN-8771.001.patch, YARN-8771.002.patch, YARN-8771.003.patch, YARN-8771.004.patch
>
>
> We found this problem when cluster is almost but not exhausted (93% used), scheduler kept allocating for an app but always fail to commit, this can blocking requests from other apps and parts of cluster resource can't be used.
> Reproduce this problem:
> (1) use DominantResourceCalculator
> (2) cluster resource has empty resource type, for example: gpu=0
> (3) scheduler allocates container for app1 who has reserved containers and whose queue limit or user limit reached(used + required > limit).
> Reference codes in RegularContainerAllocator#assignContainer:
> {code:java}
> // How much need to unreserve equals to:
> // max(required - headroom, amountNeedUnreserve)
> Resource headRoom = Resources.clone(currentResoureLimits.getHeadroom());
> Resource resourceNeedToUnReserve =
> Resources.max(rc, clusterResource,
> Resources.subtract(capability, headRoom),
> currentResoureLimits.getAmountNeededUnreserve());
> boolean needToUnreserve =
> Resources.greaterThan(rc, clusterResource,
> resourceNeedToUnReserve, Resources.none());
> {code}
> For example, resourceNeedToUnReserve can be <8GB, -6 cores, 0 gpu> when {{headRoom=<0GB, 8 vcores, 0 gpu>}} and {{capacity=<8GB, 2 vcores, 0 gpu>}}, needToUnreserve which is the result of {{Resources#greaterThan}} will be {{false}}. This is not reasonable because required resource did exceed the headroom and unreserve is needed.
> After that, when reaching the unreserve process in RegularContainerAllocator#assignContainer, unreserve process will be skipped when shouldAllocOrReserveNewContainer is true (when required containers > reserved containers) and needToUnreserve is wrongly calculated to be false:
> {code:java}
> if (availableContainers > 0) {
> if (rmContainer == null && reservationsContinueLooking
> && node.getLabels().isEmpty()) {
> // unreserve process can be wrongly skipped when shouldAllocOrReserveNewContainer=true and needToUnreserve=false but required resource did exceed the headroom
> if (!shouldAllocOrReserveNewContainer || needToUnreserve) {
> ...
> }
> }
> }
> {code}
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org