You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@archiva.apache.org by Brett Porter <br...@apache.org> on 2008/03/20 13:25:37 UTC
SVN move on March 29th
Hi,
Any objections to me locking in the morning (Australian time) of Sat
Mar 29th to do the SVN move?
I wanted to give it a bit of time so 1.0.2 can go out first rather
than interrupt that. We also need to move maven-meeper somewhere (I
suggest the infrastructure repository). Carlos - wdyt?
Cheers,
Brett
--
Brett Porter
brett@apache.org
http://blogs.exist.com/bporter/
Re: SVN move on March 29th
Posted by Maria Odea Ching <oc...@apache.org>.
Sounds good to me :-)
Thanks Brett!
-Deng
On Thu, Mar 20, 2008 at 8:25 PM, Brett Porter <br...@apache.org> wrote:
> Hi,
>
> Any objections to me locking in the morning (Australian time) of Sat
> Mar 29th to do the SVN move?
>
> I wanted to give it a bit of time so 1.0.2 can go out first rather
> than interrupt that. We also need to move maven-meeper somewhere (I
> suggest the infrastructure repository). Carlos - wdyt?
>
> Cheers,
> Brett
>
> --
> Brett Porter
> brett@apache.org
> http://blogs.exist.com/bporter/
>
>
Re: SVN move on March 29th
Posted by Joakim Erdfelt <jo...@apache.org>.
+1 to the announced move on March 29th.
Brett Porter wrote:
> Hi,
>
> Any objections to me locking in the morning (Australian time) of Sat Mar
> 29th to do the SVN move?
>
> I wanted to give it a bit of time so 1.0.2 can go out first rather than
> interrupt that. We also need to move maven-meeper somewhere (I suggest
> the infrastructure repository). Carlos - wdyt?
>
> Cheers,
> Brett
>
> --
> Brett Porter
> brett@apache.org
> http://blogs.exist.com/bporter/
>
--
- Joakim Erdfelt
Re: SVN move on March 29th
Posted by Brett Porter <br...@apache.org>.
On 21/03/2008, at 12:57 AM, Wendy Smoak wrote:
> On Thu, Mar 20, 2008 at 5:25 AM, Brett Porter <br...@apache.org>
> wrote:
>
>> Any objections to me locking in the morning (Australian time) of Sat
>> Mar 29th to do the SVN move?
>
> Sounds fine.
>
>> I wanted to give it a bit of time so 1.0.2 can go out first rather
>> than interrupt that.
>
> Does someone have a date in mind for that? I know we don't do formal
> release plans, but a heads up on the dev list would be good.
I got it down to 7 issues - I figured when they got fixed :)
Hoping I'll have the time to do so in the mornings next week.
I guess since 1.1 was timeboxed for end March, getting it ready for
the TLP move even with the current feature set is not a bad idea
shortly afterwards too.
- Brett
>
>
> --
> Wendy
--
Brett Porter
brett@apache.org
http://blogs.exist.com/bporter/
Re: SVN move on March 29th
Posted by Wendy Smoak <ws...@gmail.com>.
On Thu, Mar 20, 2008 at 5:25 AM, Brett Porter <br...@apache.org> wrote:
> Any objections to me locking in the morning (Australian time) of Sat
> Mar 29th to do the SVN move?
Sounds fine.
> I wanted to give it a bit of time so 1.0.2 can go out first rather
> than interrupt that.
Does someone have a date in mind for that? I know we don't do formal
release plans, but a heads up on the dev list would be good.
--
Wendy
Re: SVN move on March 29th
Posted by Carlos Sanchez <ca...@apache.org>.
On Thu, Mar 20, 2008 at 5:25 AM, Brett Porter <br...@apache.org> wrote:
> I wanted to give it a bit of time so 1.0.2 can go out first rather
> than interrupt that. We also need to move maven-meeper somewhere (I
> suggest the infrastructure repository). Carlos - wdyt?
doesnt really matter as long as i have access ;)
>
> Cheers,
> Brett
>
> --
> Brett Porter
> brett@apache.org
> http://blogs.exist.com/bporter/
>
>
--
I could give you my word as a Spaniard.
No good. I've known too many Spaniards.
-- The Princess Bride