You are viewing a plain text version of this content. The canonical link for it is here.
Posted to mapreduce-dev@hadoop.apache.org by "Allen Wittenauer (JIRA)" <ji...@apache.org> on 2014/07/17 21:39:05 UTC
[jira] [Resolved] (MAPREDUCE-224) limit running tasks per job
[ https://issues.apache.org/jira/browse/MAPREDUCE-224?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Allen Wittenauer resolved MAPREDUCE-224.
----------------------------------------
Resolution: Duplicate
I'm going to close this out as a duplicate of MAPREDEUCE-5583.
> limit running tasks per job
> ---------------------------
>
> Key: MAPREDUCE-224
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-224
> Project: Hadoop Map/Reduce
> Issue Type: New Feature
> Reporter: Doug Cutting
>
> It should be possible to specify a limit to the number of tasks per job permitted to run simultaneously. If, for example, you have a cluster of 50 nodes, with 100 map task slots and 100 reduce task slots, and the configured limit is 25 simultaneous tasks/job, then four or more jobs will be able to run at a time. This will permit short jobs to pass longer-running jobs. This also avoids some problems we've seen with HOD, where nodes are underutilized in their tail, and it should permit improved input locality.
--
This message was sent by Atlassian JIRA
(v6.2#6252)