1.1 freeze approaching

Just a reminder that for us to meet our four-month major release
schedule (i.e., 1.1 = Feb 18), we need to code freeze on Jan 18, which
is just about a month away on the calendar but significantly closer in
terms of man-hours as people take holiday vacations.

I've taken a first stab at moving issues to 1.2 that were tagged 1.1
but I'm pretty sure won't be done in time, with 34 issues remaining in
1.1, which is fairly optimistic [1].  Please be aware of the timeline
if you are working on or reviewing one of these tickets, or if you are
planning to volunteer for one before the freeze.

[1] https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC&mode=hide

-- 
Jonathan Ellis
Project Chair, Apache Cassandra
co-founder of DataStax, the source for professional Cassandra support
http://www.datastax.com

Re: 1.1 freeze approaching

Posted by Jeremiah Jordan <je...@morningstar.com>.
Unless you need the new features, you don't need to upgrade.  And the current version won't stop getting updates.  As mentioned in the thread where the project moved to a 4 month major version cycle, smaller changes between major versions means they will be more stable.  Even with the smaller cycle it takes a bit to get all the kinks out of new features (see all the 1.0.X releases), if the release cycle is longer, you have even longer to wait, like you did with 0.7 where it took 5-6 months, for the new release to really be stable.

-Jeremiah

On Dec 20, 2011, at 12:45 AM, Radim Kolar wrote:

> 
>> Just a reminder that for us to meet our four-month major release
>> schedule (i.e., 1.1 = Feb 18),
> can you make release cycle slower? its better to have more new features and do major upgrades less often. it saves time needed for testing and migrations.


Re: major version release schedule

Posted by Peter Schuller <pe...@infidyne.com>.
Here is another thing to consider: There is considerable cost involved
in running/developing on old branches as the divergence between the
version you're running and trunk increases.

For those actively doing development, such divergence actually causes
extra work and slows down development.

A more reasonable approach IMO is to make sure that important
*bugfixes* are backported to branches that are sufficiently old to
satisfy the criteria of the OP. But that is orthogonal to how often
new releases happen.

The OP compares with PostgreSQL, and they're in a similar position.
You can run on a fairly old version and still get critical bug fixes,
meaning that if you don't actually need the new version there is no
one telling you that you must upgrade.

It seems to me that what matters are mostly two things:

(1) When you *do* need/want to upgrade, that upgrade path you care
about being stable, and working, and the version you're upgrading too
should be stable.
(2) Critical fixes need still be maintained for the version you're
running (else you are in fact kind of forced to upgrade).

-- 
/ Peter Schuller (@scode, http://worldmodscode.wordpress.com)

Re: major version release schedule

Posted by Tatu Saloranta <ts...@gmail.com>.
On Tue, Dec 20, 2011 at 6:16 AM, Jonathan Ellis <jb...@gmail.com> wrote:
> Nobody's forcing you to upgrade.  If you want twice as much time
> between upgrading, just wait for 1.2.  In the meantime, people who
> need the features in 1.1 also get those early (no, running trunk in
> production isn't a serious option).  I don't see any real benefit for
> you in forcing your preference on everyone, and I see a big negative
> for some.
>
> It's also worth noting that waiting for 2x as many features for freeze
> will result in MORE than 2x as much complexity for tracking down
> regressions.  Given the limited testing we get during freeze, I think
> that's a pretty strong argument in favor of more-frequent, smaller
> releases.

+1. I really don't see why anyone would feel forced to upgrade just
because a new version is available.

-+ Tatu +-

Re: major version release schedule

Posted by Drew Kutcharian <dr...@venarc.com>.
I think there are couple of different ideas here at play

1) Time to release

2) Quality of the release

IMO, the issue that effects most people is the quality of the release. So when someone says that we should slow down the release cycles, I think what they mean is that we should spend more time improving the quality of the releases. Now if there is a process that can ensure the quality of the release, specially the newly added features, I don't think anyone would complain about have quick releases.

-- Drew


On Dec 20, 2011, at 4:15 PM, Peter Schuller wrote:

>> Until recently we were working hard to reach a set of goals that
>> culminated in a 1.0 release.  I'm not sure we've had a formal
>> discussion on it, but just talking to people, there seems to be
>> consensus around the idea that we're now shifting our goals and
>> priorities around some (usability, stability, etc).  If that's the
>> case, I think we should at least be open to reevaluating our release
>> process and schedule accordingly (whether that means lengthening,
>> shorting, and/or simply shifting the barrier-to-entry for stable
>> updates).
> 
> Personally I am all for added stability, quality, and testing. But I
> don't see how a decreased release frequency will cause more stability.
> It may be that decreased release frequency is the necessary *result*
> of more stability, but I don't think the causality points in the other
> direction unless developers ship things early to get it into the
> release.
> 
> But also keep in mind: If we reach a point where major users of
> Cassandra need to run on significantly divergent versions of Cassandra
> because the release is just too old, the "normal" mainstream release
> will end up getting even less testing.
> 
> -- 
> / Peter Schuller (@scode, http://worldmodscode.wordpress.com)


Re: major version release schedule

Posted by Peter Schuller <pe...@infidyne.com>.
> Until recently we were working hard to reach a set of goals that
> culminated in a 1.0 release.  I'm not sure we've had a formal
> discussion on it, but just talking to people, there seems to be
> consensus around the idea that we're now shifting our goals and
> priorities around some (usability, stability, etc).  If that's the
> case, I think we should at least be open to reevaluating our release
> process and schedule accordingly (whether that means lengthening,
> shorting, and/or simply shifting the barrier-to-entry for stable
> updates).

Personally I am all for added stability, quality, and testing. But I
don't see how a decreased release frequency will cause more stability.
It may be that decreased release frequency is the necessary *result*
of more stability, but I don't think the causality points in the other
direction unless developers ship things early to get it into the
release.

But also keep in mind: If we reach a point where major users of
Cassandra need to run on significantly divergent versions of Cassandra
because the release is just too old, the "normal" mainstream release
will end up getting even less testing.

-- 
/ Peter Schuller (@scode, http://worldmodscode.wordpress.com)

Re: major version release schedule

Posted by Eric Evans <ee...@acunu.com>.
On Tue, Dec 20, 2011 at 8:16 AM, Jonathan Ellis <jb...@gmail.com> wrote:
> Nobody's forcing you to upgrade.  If you want twice as much time
> between upgrading, just wait for 1.2.  In the meantime, people who
> need the features in 1.1 also get those early (no, running trunk in
> production isn't a serious option).  I don't see any real benefit for
> you in forcing your preference on everyone, and I see a big negative
> for some.
>
> It's also worth noting that waiting for 2x as many features for freeze
> will result in MORE than 2x as much complexity for tracking down
> regressions.  Given the limited testing we get during freeze, I think
> that's a pretty strong argument in favor of more-frequent, smaller
> releases.

Until recently we were working hard to reach a set of goals that
culminated in a 1.0 release.  I'm not sure we've had a formal
discussion on it, but just talking to people, there seems to be
consensus around the idea that we're now shifting our goals and
priorities around some (usability, stability, etc).  If that's the
case, I think we should at least be open to reevaluating our release
process and schedule accordingly (whether that means lengthening,
shorting, and/or simply shifting the barrier-to-entry for stable
updates).

> On Tue, Dec 20, 2011 at 7:42 AM, Radim Kolar <hs...@sendmail.cz> wrote:
>> http://www.mail-archive.com/dev@cassandra.apache.org/msg01549.html
>>
>> I read it but things are different now because magic 1.0 is out. If you
>> implement 1.0 and put it into production, you really do not want to retest
>> app on new version every 4 months and its unlikely that you will get
>> migration approved by management unless you present clear benefits for such
>> migration. Compression was nice new feature of 1.0 but it was rejected by
>> lot of IT managers  as "too risky" for now.

-- 
Eric Evans
Acunu | http://www.acunu.com | @acunu

Re: major version release schedule

Posted by Radim Kolar <hs...@sendmail.cz>.
> Nobody's forcing you to upgrade.  If you want twice as much time
> between upgrading, just wait for 1.2.
Currently 1.0 branch is still less stable then 0.8, i still get OOM on 
some nodes. Adding 1.1 feature set on top will make it less stable.
> It's also worth noting that waiting for 2x as many features for freeze
> will result in MORE than 2x as much complexity for tracking down
> regressions.
Then make releases from 2 branches - stable and dev. Its common practice 
used in lot of software projects.

>  I really don't see why anyone would feel forced to upgrade just because a new version is available.
you will get less likely bugfixes if new branch comes out. Also client libraries needs some time to catch release.



Re: major version release schedule

Posted by Jonathan Ellis <jb...@gmail.com>.
Nobody's forcing you to upgrade.  If you want twice as much time
between upgrading, just wait for 1.2.  In the meantime, people who
need the features in 1.1 also get those early (no, running trunk in
production isn't a serious option).  I don't see any real benefit for
you in forcing your preference on everyone, and I see a big negative
for some.

It's also worth noting that waiting for 2x as many features for freeze
will result in MORE than 2x as much complexity for tracking down
regressions.  Given the limited testing we get during freeze, I think
that's a pretty strong argument in favor of more-frequent, smaller
releases.

On Tue, Dec 20, 2011 at 7:42 AM, Radim Kolar <hs...@sendmail.cz> wrote:
> http://www.mail-archive.com/dev@cassandra.apache.org/msg01549.html
>
> I read it but things are different now because magic 1.0 is out. If you
> implement 1.0 and put it into production, you really do not want to retest
> app on new version every 4 months and its unlikely that you will get
> migration approved by management unless you present clear benefits for such
> migration. Compression was nice new feature of 1.0 but it was rejected by
> lot of IT managers  as "too risky" for now.
>
> While you can test application quite easily, testing cluster stability is
> way harder in test environment because its not usually possible to fully
> replicate workload and data volume in test environment and migration back is
> difficult because Cassandra currently does not have tool for fast sstable
> downgrade (1.0 -> 0.8).
>
> For production use long time between major releases is better. I would
> double time between major releases, maybe not for 1.1/1.2 but later for
> sure.  Take look at postgresql project, they release 1 major version per
> year and they support 4 major versions for bugfixes and older postgresql
> versions are still common in production.
>
> Did you asked people running mission critical workloads about their opinion?
> Another possibility is to use ISV like Datastax to provide long term
> support.



-- 
Jonathan Ellis
Project Chair, Apache Cassandra
co-founder of DataStax, the source for professional Cassandra support
http://www.datastax.com

major version release schedule

Posted by Radim Kolar <hs...@sendmail.cz>.
http://www.mail-archive.com/dev@cassandra.apache.org/msg01549.html

I read it but things are different now because magic 1.0 is out. If you 
implement 1.0 and put it into production, you really do not want to 
retest app on new version every 4 months and its unlikely that you will 
get migration approved by management unless you present clear benefits 
for such migration. Compression was nice new feature of 1.0 but it was 
rejected by lot of IT managers  as "too risky" for now.

While you can test application quite easily, testing cluster stability 
is way harder in test environment because its not usually possible to 
fully replicate workload and data volume in test environment and 
migration back is difficult because Cassandra currently does not have 
tool for fast sstable downgrade (1.0 -> 0.8).

For production use long time between major releases is better. I would 
double time between major releases, maybe not for 1.1/1.2 but later for 
sure.  Take look at postgresql project, they release 1 major version per 
year and they support 4 major versions for bugfixes and older postgresql 
versions are still common in production.

Did you asked people running mission critical workloads about their 
opinion? Another possibility is to use ISV like Datastax to provide long 
term support.

Re: 1.1 freeze approaching

Posted by Jeremy Hanna <je...@gmail.com>.
I like this part of that thread (w00t for a distributed test suite):

> # Automate all tests
>
> I think the only way that we can keep people close to trunk and stay
> stable is to build automated tests for *everything*. All code should
> be exercised by thorough unit tests and distributed black-box tests.
> Every regression should get a test.

Agreed.

On Dec 20, 2011, at 1:16 AM, Brandon Williams wrote:

> On Tue, Dec 20, 2011 at 12:45 AM, Radim Kolar <hs...@sendmail.cz> wrote:
>> can you make release cycle slower? its better to have more new features and
>> do major upgrades less often. it saves time needed for testing and
>> migrations.
> 
> http://www.mail-archive.com/dev@cassandra.apache.org/msg01549.html
> 
> -Brandon


Re: 1.1 freeze approaching

Posted by Brandon Williams <dr...@gmail.com>.
On Tue, Dec 20, 2011 at 12:45 AM, Radim Kolar <hs...@sendmail.cz> wrote:
> can you make release cycle slower? its better to have more new features and
> do major upgrades less often. it saves time needed for testing and
> migrations.

http://www.mail-archive.com/dev@cassandra.apache.org/msg01549.html

-Brandon

Re: 1.1 freeze approaching

Posted by Radim Kolar <hs...@sendmail.cz>.
> Just a reminder that for us to meet our four-month major release
> schedule (i.e., 1.1 = Feb 18),
can you make release cycle slower? its better to have more new features 
and do major upgrades less often. it saves time needed for testing and 
migrations.

Re: 1.1 freeze approaching

Posted by Sylvain Lebresne <sy...@datastax.com>.
+1

On Tue, Jan 10, 2012 at 11:30 PM, Jonathan Ellis <jb...@gmail.com> wrote:
> On Tue, Jan 10, 2012 at 3:59 PM, Brandon Williams <dr...@gmail.com> wrote:
>> On Tue, Jan 10, 2012 at 2:59 PM, Jonathan Ellis <jb...@gmail.com> wrote:
>>> I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
>>> with CQL;
>>
>> Actually 1391 doesn't, but is quite important nonetheless.
>
> The connection there is that if it works as planned, we get
> CASSANDRA-2477 for free.
>
> --
> Jonathan Ellis
> Project Chair, Apache Cassandra
> co-founder of DataStax, the source for professional Cassandra support
> http://www.datastax.com

Re: 1.1 freeze approaching

Posted by Jonathan Ellis <jb...@gmail.com>.
On Tue, Jan 10, 2012 at 3:59 PM, Brandon Williams <dr...@gmail.com> wrote:
> On Tue, Jan 10, 2012 at 2:59 PM, Jonathan Ellis <jb...@gmail.com> wrote:
>> I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
>> with CQL;
>
> Actually 1391 doesn't, but is quite important nonetheless.

The connection there is that if it works as planned, we get
CASSANDRA-2477 for free.

-- 
Jonathan Ellis
Project Chair, Apache Cassandra
co-founder of DataStax, the source for professional Cassandra support
http://www.datastax.com

Re: 1.1 freeze approaching

Posted by Brandon Williams <dr...@gmail.com>.
On Tue, Jan 10, 2012 at 2:59 PM, Jonathan Ellis <jb...@gmail.com> wrote:
> I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
> with CQL;

Actually 1391 doesn't, but is quite important nonetheless.

> All of these (with the exception of 3707, which is relatively quick)
> are in progress, and some (2475, 1391) are almost complete, but I
> don't think we're going to get all of them done by the 18th.
>
> Thus, I'd like to propopose postponing the freeze one more week, until the 25th.

+1

-Brandon

Re: 1.1 freeze approaching

Posted by Eric Evans <ee...@acunu.com>.
On Tue, Jan 10, 2012 at 2:59 PM, Jonathan Ellis <jb...@gmail.com> wrote:
> I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
> with CQL; I strongly believe that 1.1 needs to be where CQL goes from
> being "the future" to being "the present."  We've been promising this
> for almost a year now and it's time to deliver.
>
> All of these (with the exception of 3707, which is relatively quick)
> are in progress, and some (2475, 1391) are almost complete, but I
> don't think we're going to get all of them done by the 18th.
>
> Thus, I'd like to propopose postponing the freeze one more week, until the 25th.

I think that would be for the best, +1

-- 
Eric Evans
Acunu | http://www.acunu.com | @acunu

Re: 1.1 freeze approaching

Posted by Jonathan Ellis <jb...@gmail.com>.
I've created a 1.1 branch in git.  The freeze is on!

On Tue, Jan 10, 2012 at 2:59 PM, Jonathan Ellis <jb...@gmail.com> wrote:
> I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
> with CQL; I strongly believe that 1.1 needs to be where CQL goes from
> being "the future" to being "the present."  We've been promising this
> for almost a year now and it's time to deliver.
>
> All of these (with the exception of 3707, which is relatively quick)
> are in progress, and some (2475, 1391) are almost complete, but I
> don't think we're going to get all of them done by the 18th.
>
> Thus, I'd like to propopose postponing the freeze one more week, until the 25th.
>
> [1] https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC
>
> On Mon, Dec 19, 2011 at 11:56 AM, Jonathan Ellis <jb...@gmail.com> wrote:
>> Just a reminder that for us to meet our four-month major release
>> schedule (i.e., 1.1 = Feb 18), we need to code freeze on Jan 18, which
>> is just about a month away on the calendar but significantly closer in
>> terms of man-hours as people take holiday vacations.
>>
>> I've taken a first stab at moving issues to 1.2 that were tagged 1.1
>> but I'm pretty sure won't be done in time, with 34 issues remaining in
>> 1.1, which is fairly optimistic [1].  Please be aware of the timeline
>> if you are working on or reviewing one of these tickets, or if you are
>> planning to volunteer for one before the freeze.
>>
>> [1] https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC&mode=hide
>>
>> --
>> Jonathan Ellis
>> Project Chair, Apache Cassandra
>> co-founder of DataStax, the source for professional Cassandra support
>> http://www.datastax.com
>
>
>
> --
> Jonathan Ellis
> Project Chair, Apache Cassandra
> co-founder of DataStax, the source for professional Cassandra support
> http://www.datastax.com



-- 
Jonathan Ellis
Project Chair, Apache Cassandra
co-founder of DataStax, the source for professional Cassandra support
http://www.datastax.com

Re: 1.1 freeze approaching

Posted by Jonathan Ellis <jb...@gmail.com>.
I've tagged 7 tickets as "critical" [1] for 1.1.  All of them deal
with CQL; I strongly believe that 1.1 needs to be where CQL goes from
being "the future" to being "the present."  We've been promising this
for almost a year now and it's time to deliver.

All of these (with the exception of 3707, which is relatively quick)
are in progress, and some (2475, 1391) are almost complete, but I
don't think we're going to get all of them done by the 18th.

Thus, I'd like to propopose postponing the freeze one more week, until the 25th.

[1] https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC

On Mon, Dec 19, 2011 at 11:56 AM, Jonathan Ellis <jb...@gmail.com> wrote:
> Just a reminder that for us to meet our four-month major release
> schedule (i.e., 1.1 = Feb 18), we need to code freeze on Jan 18, which
> is just about a month away on the calendar but significantly closer in
> terms of man-hours as people take holiday vacations.
>
> I've taken a first stab at moving issues to 1.2 that were tagged 1.1
> but I'm pretty sure won't be done in time, with 34 issues remaining in
> 1.1, which is fairly optimistic [1].  Please be aware of the timeline
> if you are working on or reviewing one of these tickets, or if you are
> planning to volunteer for one before the freeze.
>
> [1] https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC&mode=hide
>
> --
> Jonathan Ellis
> Project Chair, Apache Cassandra
> co-founder of DataStax, the source for professional Cassandra support
> http://www.datastax.com



-- 
Jonathan Ellis
Project Chair, Apache Cassandra
co-founder of DataStax, the source for professional Cassandra support
http://www.datastax.com

Re: 1.1 freeze approaching

Posted by Vijay <vi...@gmail.com>.
+1

Regards,
</VJ>



On Mon, Dec 19, 2011 at 9:56 AM, Jonathan Ellis <jb...@gmail.com> wrote:

> Just a reminder that for us to meet our four-month major release
> schedule (i.e., 1.1 = Feb 18), we need to code freeze on Jan 18, which
> is just about a month away on the calendar but significantly closer in
> terms of man-hours as people take holiday vacations.
>
> I've taken a first stab at moving issues to 1.2 that were tagged 1.1
> but I'm pretty sure won't be done in time, with 34 issues remaining in
> 1.1, which is fairly optimistic [1].  Please be aware of the timeline
> if you are working on or reviewing one of these tickets, or if you are
> planning to volunteer for one before the freeze.
>
> [1]
> https://issues.apache.org/jira/secure/IssueNavigator.jspa?reset=true&jqlQuery=project+%3D+CASSANDRA+AND+fixVersion+%3D+%221.1%22+AND+resolution+%3D+Unresolved+ORDER+BY+due+ASC%2C+priority+DESC%2C+created+ASC&mode=hide
>
> --
> Jonathan Ellis
> Project Chair, Apache Cassandra
> co-founder of DataStax, the source for professional Cassandra support
> http://www.datastax.com
>