You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Davide Giannella (JIRA)" <ji...@apache.org> on 2019/03/28 13:11:06 UTC
[jira] [Updated] (OAK-8070) The date-based copy-versions directive
doesn't work correctly with include-paths
[ https://issues.apache.org/jira/browse/OAK-8070?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Davide Giannella updated OAK-8070:
----------------------------------
Fix Version/s: (was: 1.11.0)
> The date-based copy-versions directive doesn't work correctly with include-paths
> --------------------------------------------------------------------------------
>
> Key: OAK-8070
> URL: https://issues.apache.org/jira/browse/OAK-8070
> Project: Jackrabbit Oak
> Issue Type: Bug
> Components: upgrade
> Affects Versions: 1.6.7, 1.0.40, 1.4.19, 1.8.0, 1.2.28, 1.10.0
> Reporter: Tomek Rękawek
> Assignee: Tomek Rękawek
> Priority: Major
> Fix For: 1.12.0, 1.6.17, 1.10.1, 1.8.12
>
>
> It seems that the OAK-6633 introduced a regression. Right now, if the include-paths is used together with a date-based copy-versions, the second copy-versions date is ignored and all the versions are removed.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)