You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Dmitry Lysnichenko (JIRA)" <ji...@apache.org> on 2015/05/08 11:55:00 UTC

[jira] [Updated] (AMBARI-11016) RU: Re-arrange manual steps in upgrade packs

     [ https://issues.apache.org/jira/browse/AMBARI-11016?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Dmitry Lysnichenko updated AMBARI-11016:
----------------------------------------
    Description: 
The goal is to run a *happy path *Rolling Upgrade in silent mode.
For this, we should have manual steps either at the beginning (pre-reqs, backups etc) or at the end (confirm finalize etc). Today, there are some manual steps in the middle of RU for Hive, Storm, Oozie, Ranger (and maybe others).
As part of this task:
Lets make a list of the manual steps that are presented to the user in the middle or RU
Lets try and move these manual steps to the beginning of RU if feasible.
Note: We will have multiple upgrade packs now (Champlain->Champlain+, Champlain->Dal, Dal-Dal+). We should make sure we fix all the upgrade packs.

Moved Ranger backup manual step

  was:
The goal is to run a *happy path *Rolling Upgrade in silent mode.
For this, we should have manual steps either at the beginning (pre-reqs, backups etc) or at the end (confirm finalize etc). Today, there are some manual steps in the middle of RU for Hive, Storm, Oozie, Ranger (and maybe others).
As part of this task:
Lets make a list of the manual steps that are presented to the user in the middle or RU
Lets try and move these manual steps to the beginning of RU if feasible.
Note: We will have multiple upgrade packs now (Champlain->Champlain+, Champlain->Dal, Dal-Dal+). We should make sure we fix all the upgrade packs.

Moved Ranger backup manual message


> RU: Re-arrange manual steps in upgrade packs
> --------------------------------------------
>
>                 Key: AMBARI-11016
>                 URL: https://issues.apache.org/jira/browse/AMBARI-11016
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-server
>    Affects Versions: 2.1.0
>            Reporter: Dmitry Lysnichenko
>            Assignee: Dmitry Lysnichenko
>             Fix For: 2.1.0
>
>
> The goal is to run a *happy path *Rolling Upgrade in silent mode.
> For this, we should have manual steps either at the beginning (pre-reqs, backups etc) or at the end (confirm finalize etc). Today, there are some manual steps in the middle of RU for Hive, Storm, Oozie, Ranger (and maybe others).
> As part of this task:
> Lets make a list of the manual steps that are presented to the user in the middle or RU
> Lets try and move these manual steps to the beginning of RU if feasible.
> Note: We will have multiple upgrade packs now (Champlain->Champlain+, Champlain->Dal, Dal-Dal+). We should make sure we fix all the upgrade packs.
> Moved Ranger backup manual step



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)