You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@myriad.apache.org by "Santosh Marella (JIRA)" <ji...@apache.org> on 2015/11/10 21:00:11 UTC
[jira] [Reopened] (MYRIAD-108) Multi project
[ https://issues.apache.org/jira/browse/MYRIAD-108?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Santosh Marella reopened MYRIAD-108:
------------------------------------
Assignee: Ken Sipe
> Multi project
> -------------
>
> Key: MYRIAD-108
> URL: https://issues.apache.org/jira/browse/MYRIAD-108
> Project: Myriad
> Issue Type: Bug
> Reporter: Ken Sipe
> Assignee: Ken Sipe
>
> large change to build as a multi-project build. It was too much work to rebase the previous [PR-77|https://github.com/mesos/myriad/pull/77]
> This is basically the same work however I've updated all the docs now and have tested the vagrant configuration.
> Lets get this checked and merged!
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)