You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Yangze Guo (Jira)" <ji...@apache.org> on 2022/06/13 02:35:00 UTC
[jira] [Closed] (FLINK-27921) Introduce the checkResourceRequirementsWithDelay in DeclarativeSlotManager
[ https://issues.apache.org/jira/browse/FLINK-27921?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Yangze Guo closed FLINK-27921.
------------------------------
Fix Version/s: 1.16.0
Resolution: Fixed
> Introduce the checkResourceRequirementsWithDelay in DeclarativeSlotManager
> --------------------------------------------------------------------------
>
> Key: FLINK-27921
> URL: https://issues.apache.org/jira/browse/FLINK-27921
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Reporter: Aitozi
> Assignee: Aitozi
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.16.0
>
>
> As discussed in [https://github.com/apache/flink/pull/19840#discussion_r884242067] .This
> ticket is meant to introduce the same mechanism to wait for a slight delay before process the resource check with {{{}FineGrainedSlotManager{}}}. It will reduce the frequency of unnecessary re-allocations
--
This message was sent by Atlassian Jira
(v8.20.7#820007)