You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@lucene.apache.org by "Steve Rowe (JIRA)" <ji...@apache.org> on 2017/03/17 01:01:54 UTC
[jira] [Updated] (LUCENE-7748) buildAndPushRelease.py should fail
if the project DOAP files are missing releases that are less than the
release being produced
[ https://issues.apache.org/jira/browse/LUCENE-7748?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Steve Rowe updated LUCENE-7748:
-------------------------------
Attachment: LUCENE-7748.patch
WIP patch from a couple weeks ago, may be out of date.
I plan on getting this in place before it's time to cut the first 6.5 RC.
> buildAndPushRelease.py should fail if the project DOAP files are missing releases that are less than the release being produced
> -------------------------------------------------------------------------------------------------------------------------------
>
> Key: LUCENE-7748
> URL: https://issues.apache.org/jira/browse/LUCENE-7748
> Project: Lucene - Core
> Issue Type: Task
> Reporter: Steve Rowe
> Priority: Minor
> Attachments: LUCENE-7748.patch
>
>
> I wrote on the 6.4.1 release vote thread:
> {quote}
> One minor problem with both Changes.html files: there is no release date on the 6.4.0 release section. The 6.4.0 release section was never added to the DOAP files under dev-tools/doap/ on branch_6_4. I’ll think about a way of automating a test to prevent this in the future. In the meantime, I’ll add a reminder to sanity check the DOAP files before a release to the ReleaseToDo.
> {quote}
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@lucene.apache.org
For additional commands, e-mail: dev-help@lucene.apache.org