You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Zhijie Shen (JIRA)" <ji...@apache.org> on 2015/07/02 21:16:04 UTC
[jira] [Created] (YARN-3881) Writing RM cluster-level metrics
Zhijie Shen created YARN-3881:
---------------------------------
Summary: Writing RM cluster-level metrics
Key: YARN-3881
URL: https://issues.apache.org/jira/browse/YARN-3881
Project: Hadoop YARN
Issue Type: Sub-task
Components: timelineserver
Reporter: Zhijie Shen
Assignee: Zhijie Shen
RM has a bunch of metrics that we may want to write into the timeline backend to. I attached the metrics.json that I've crawled via {{http://localhost:8088/jmx?qry=Hadoop:*}}. IMHO, we need to pay attention to three groups of metrics:
1. QueueMetrics
2. JvmMetrics
3. ClusterMetrics
The problem is that unlike other metrics belongs to a single application, these ones belongs to RM or cluster-wide. Therefore, current write path is not going to work for these metrics because they don't have the associated user/flow/app context info. We need to rethink of modeling cross-app metrics and the api to handle them.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)