You are viewing a plain text version of this content. The canonical link for it is here.
Posted to user@jmeter.apache.org by Siva Pannier <ps...@TechMahindra.com> on 2008/04/17 11:56:03 UTC
Stress testing my Server
Hi All,
I want to do stress testing for my server. How can I fire more cases to
the server through JMeter. Currently I have done the below configuration
Server
Bea Weblogic server has 20 idle threads
Queue for waiting requests - 65k requests
Jmeter
Has 200 threads
Loop count forever
Constant Throughput Timer is set to 600
I want to fire more no of test cases very quickly. My server is capable
of easily handling 6 to 7 transactions per second. I want to find the
maximum value by loading the server more. How can I do this.
What is the benefit of CTT - constant throughput timer? Does it help any
way?
Thanks,
Shiv..
============================================================================================================================
Disclaimer:
This message and the information contained herein is proprietary and confidential and subject to the Tech Mahindra policy statement, you may review the policy at <a href="http://www.techmahindra.com/Disclaimer.html">http://www.techmahindra.com/Disclaimer.html</a> externally and <a href="http://tim.techmahindra.com/Disclaimer.html">http://tim.techmahindra.com/Disclaimer.html</a> internally within Tech Mahindra.
============================================================================================================================
Re: Stress testing my Server
Posted by David Brown <da...@davidwbrown.name>.
Read: http://jakarta.apache.org/jmeter/usermanual/jmeter_distributed_testing_step_by_step.pdf
Siva Pannier wrote ..
>
> Hi All,
>
>
>
> I want to do stress testing for my server. How can I fire more cases to
> the server through JMeter. Currently I have done the below configuration
>
>
>
> Server
>
> Bea Weblogic server has 20 idle threads
>
> Queue for waiting requests - 65k requests
>
>
>
> Jmeter
>
> Has 200 threads
>
> Loop count forever
>
> Constant Throughput Timer is set to 600
>
>
>
> I want to fire more no of test cases very quickly. My server is capable
> of easily handling 6 to 7 transactions per second. I want to find the
> maximum value by loading the server more. How can I do this.
>
>
>
> What is the benefit of CTT - constant throughput timer? Does it help any
> way?
>
>
>
> Thanks,
>
> Shiv..
>
>
>
> ============================================================================================================================
>
> Disclaimer:
>
> This message and the information contained herein is proprietary and confidential
> and subject to the Tech Mahindra policy statement, you may review the policy at
> <a href="http://www.techmahindra.com/Disclaimer.html">http://www.techmahindra.com/Disclaimer.html</a>
> externally and <a href="http://tim.techmahindra.com/Disclaimer.html">http://tim.techmahindra.com/Disclaimer.html</a>
> internally within Tech Mahindra.
>
> ============================================================================================================================
---------------------------------------------------------------------
To unsubscribe, e-mail: jmeter-user-unsubscribe@jakarta.apache.org
For additional commands, e-mail: jmeter-user-help@jakarta.apache.org