You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Ted Yu (JIRA)" <ji...@apache.org> on 2016/07/18 20:54:20 UTC
[jira] [Commented] (HBASE-14123) HBase Backup/Restore Phase 2
[ https://issues.apache.org/jira/browse/HBASE-14123?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15383041#comment-15383041 ]
Ted Yu commented on HBASE-14123:
--------------------------------
Planning to re-use this JIRA for running test suite against master branch.
> HBase Backup/Restore Phase 2
> ----------------------------
>
> Key: HBASE-14123
> URL: https://issues.apache.org/jira/browse/HBASE-14123
> Project: HBase
> Issue Type: Umbrella
> Reporter: Vladimir Rodionov
> Assignee: Vladimir Rodionov
> Attachments: 14123-v14.txt, HBASE-14123-for-7912-v1.patch, HBASE-14123-for-7912-v6.patch, HBASE-14123-v1.patch, HBASE-14123-v10.patch, HBASE-14123-v11.patch, HBASE-14123-v12.patch, HBASE-14123-v13.patch, HBASE-14123-v15.patch, HBASE-14123-v16.patch, HBASE-14123-v2.patch, HBASE-14123-v3.patch, HBASE-14123-v4.patch, HBASE-14123-v5.patch, HBASE-14123-v6.patch, HBASE-14123-v7.patch, HBASE-14123-v9.patch
>
>
> Phase 2 umbrella JIRA. See HBASE-7912 for design document and description.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)