You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Sean Busbey (JIRA)" <ji...@apache.org> on 2015/06/23 06:34:00 UTC
[jira] [Resolved] (HBASE-13749) ensure pre-commit builds for
branch-1 include both java 7 and java 8
[ https://issues.apache.org/jira/browse/HBASE-13749?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Sean Busbey resolved HBASE-13749.
---------------------------------
Resolution: Won't Fix
Fix Version/s: (was: 1.2.0)
closing as won't fix.
Our current state of test-patch has no means to handle multiple JVM versions by branch, which means we'd have to run a jenkins matrix build that does the entire pre-comit patch testing process under java 7 and java 8 for all patches. Since our test-patch output doesn't indicate what the java version is during jira commenting, it'd be confusing seeing duplicate messages.
Just wait for a release from the patch tester project that supports multiple jvm verisons.
> ensure pre-commit builds for branch-1 include both java 7 and java 8
> --------------------------------------------------------------------
>
> Key: HBASE-13749
> URL: https://issues.apache.org/jira/browse/HBASE-13749
> Project: HBase
> Issue Type: Sub-task
> Reporter: Sean Busbey
> Assignee: Sean Busbey
>
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)