You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Chesnay Schepler (JIRA)" <ji...@apache.org> on 2017/07/25 11:33:01 UTC
[jira] [Closed] (FLINK-7256) End-to-end tests should only be run
after successful compilation
[ https://issues.apache.org/jira/browse/FLINK-7256?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Chesnay Schepler closed FLINK-7256.
-----------------------------------
Resolution: Fixed
1.4: e5dad7fc8b9a15c667fe8cd31c65a3ed78868612
> End-to-end tests should only be run after successful compilation
> ----------------------------------------------------------------
>
> Key: FLINK-7256
> URL: https://issues.apache.org/jira/browse/FLINK-7256
> Project: Flink
> Issue Type: Improvement
> Components: Tests, Travis
> Affects Versions: 1.4.0
> Reporter: Chesnay Schepler
> Assignee: Chesnay Schepler
> Fix For: 1.4.0
>
>
> If the compilation fails (for example due to checkstyle) the end-to-end tests are currently still run, even though flink-dist most likely wasn't even built.
> Similar to FLINK-7176.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)