You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Piotr Nowojski (Jira)" <ji...@apache.org> on 2020/04/08 08:02:00 UTC
[jira] [Commented] (FLINK-16864) Add idle metrics for Task
[ https://issues.apache.org/jira/browse/FLINK-16864?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17077927#comment-17077927 ]
Piotr Nowojski commented on FLINK-16864:
----------------------------------------
merged commit 1878723 into apache:master
> Add idle metrics for Task
> -------------------------
>
> Key: FLINK-16864
> URL: https://issues.apache.org/jira/browse/FLINK-16864
> Project: Flink
> Issue Type: Improvement
> Components: Runtime / Metrics, Runtime / Task
> Reporter: Wenlong Lyu
> Assignee: Wenlong Lyu
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.11.0
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> Currently there is no metric for user to measure how busy a task is concretely, which is important for user to decide how to tune a job.
> We would like to propose adding an IdleTime which measure idle time of a task including the time cost for mail processor to wait for new mail and the time cost in record writer to waiting a new buffer.
> With the idle time:
> 1. when a job can not catch up with the speed of data generating, the vertex which idle time is near to zero is the bottle neck of the job.
> 2. when a job is not busy, idle time can be used to guide user how much he can scale down the job.
> In addition, measuring idle time can have little impaction on the performance of the job, because when a task is busy, we don't touch the code to measure wait-time in mailbox.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)