You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Peter Bacsko (Jira)" <ji...@apache.org> on 2019/10/11 12:01:00 UTC

[jira] [Created] (YARN-9891) Capacity scheduler: enhance capacity / maximum-capacity setting

Peter Bacsko created YARN-9891:
----------------------------------

             Summary: Capacity scheduler: enhance capacity / maximum-capacity setting
                 Key: YARN-9891
                 URL: https://issues.apache.org/jira/browse/YARN-9891
             Project: Hadoop YARN
          Issue Type: Sub-task
            Reporter: Peter Bacsko


Capacity Scheduler does not support two percentage values for capacity and maximum-capacity settings. So, you can't do something like this:

{{yarn.scheduler.capacity.root.users.john.maximum-capacity=memory-mb=50.0%, vcores=50.0%}}

It's possible to use absolute resources, but not two separate percentages (which expresses capacity as a percentage of the overall cluster resource). Such a configuration is accepted in Fair Scheduler.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscribe@hadoop.apache.org
For additional commands, e-mail: yarn-issues-help@hadoop.apache.org