You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Francesco Mari (JIRA)" <ji...@apache.org> on 2015/09/30 10:23:05 UTC

[jira] [Resolved] (OAK-3461) Run m-bundle-p:baseline before integration tests

     [ https://issues.apache.org/jira/browse/OAK-3461?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Francesco Mari resolved OAK-3461.
---------------------------------
       Resolution: Fixed
    Fix Version/s: 1.3.7

Fixed in trunk at r1705977.

> Run m-bundle-p:baseline before integration tests
> ------------------------------------------------
>
>                 Key: OAK-3461
>                 URL: https://issues.apache.org/jira/browse/OAK-3461
>             Project: Jackrabbit Oak
>          Issue Type: Improvement
>          Components: parent
>            Reporter: Francesco Mari
>            Assignee: Francesco Mari
>             Fix For: 1.3.7
>
>
> The baseline goal of the maven-bundle-plugin is currently bound to the verify phase (as per default). It should be bound to the pre-integration-test phase to give it a possibility to fail before integration tests are executed.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)