You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Zhu Zhu (JIRA)" <ji...@apache.org> on 2019/04/11 06:18:00 UTC

[jira] [Commented] (FLINK-12131) Resetting ExecutionVertex in region failover may cause inconsistency of IntermediateResult status

    [ https://issues.apache.org/jira/browse/FLINK-12131?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16815110#comment-16815110 ] 

Zhu Zhu commented on FLINK-12131:
---------------------------------

Hi [~till.rohrmann], I think this fix is needed to make region failover(FLINK-4256) work.

I posted a detailed design above. Could you take a look at it?

I can start a PR if you think it is fine.

> Resetting ExecutionVertex in region failover may cause inconsistency of IntermediateResult status
> -------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-12131
>                 URL: https://issues.apache.org/jira/browse/FLINK-12131
>             Project: Flink
>          Issue Type: Bug
>          Components: Runtime / Coordination
>    Affects Versions: 1.9.0
>            Reporter: Zhu Zhu
>            Assignee: Zhu Zhu
>            Priority: Major
>
> Two status may not be correct with region failover and current reset logic.
>  # *numberOfRunningProducers* in *IntermediateResult*.
>  # *hasDataProduced* in *IntermediateResultPartition*.
> This is because currently only when the *ExecutionJobVertex* is reset will the related *IntermediateResult*(and the inner *IntermediateResultPartition*) get reset. But region failover resets the affected *ExecutionVertex(ex)*,  rather than the entire *ExecutionJobVertex*.
> Problems below may occur as a result:
>  # when a FINISHED vertex is restarted and finishes again, the *IntermediateResult.numberOfRunningProducers* may drop below 0 and throws exception to trigger global failover
>  # the *IntermediateResult.numberOfRunningProducers* can be smaller than fact, letting the downstream vertices scheduled earlier than expected
>  # the *IntermediateResultPartition* is reset and not started yet but the *hasDataProduced* remains true
> That's why I'd propose we add IntermediateResult status adjust logic to *ExecutionVertex.**resetForNewExecution()***.
> Detailed design: [https://docs.google.com/document/d/1YA3k8rwDEv1UdaV9NwoDmwc-XorG__JUXlpyJtDs4Ss/edit?usp=sharing] 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)